j,
8 U T L E R
PARTNERS
Residential Development
215-219 David Low Way, Peregian Beach
Draft Acid Sulfate Soil Management Plan (ASSMP)
Element Acid Sulfate Soil Management Plan
Objectiverrarget The objective of the ASSMP is to control net acidity levels within soils disturbed during
site development works, and to restrict to an acceptable level any potential on-site and
off-site environmental impacts during site redevelopment.
ASS Management To mitigate and manage potential environmental impacts associated with ASS during the
Strategy redevelopmep~~ W k~ Jhis>.~’Yill be achieved by havln~ a mat~rials handling and
managem~l:sfrategy In: BJ .$6; as well as procedures for either on-site lime treatment of
soils or,
located
t~(apprOPria.~;Ifff-site treatment of soils (if suitably sized and appropriately
spice is not va able}er’on-sile treatment).
a
Tasks/Actions An ASS invesltgffiJ1tr has,!.l~efii ltj~d out to assess the soils within the redevelopment
site, to a maximum dep’W f 2.5m b.51IQW, the existing surface level. Fill materials, sands
and silty sands have’l’l en sho~n tdW6 negligible levels of net acidity and do not
nta.i.o
require treatment for ASS. Ho,~v J"tl)e nafi.jfal dark grey-brown, silty clays encountered
[1l’2)’to contqj .]eY(lls of net acidity that exceed
in Bores 1 and 2 have been sJi wn (iri ’B
the State
Pla~ning Policy 2/02,~c, ~9&ril
ria 9~d:q~
O/~S: JIle natural silty clays will
’/
therefore reqUire treatment as folfow~? .
’.
;;’
.
f,,;;,~.>t’
. If on-site treatment is undertake~ then’Jinfu treatme’rit’ f the soils will be undertaken
.
as described below.
’Jt_r ,{:{" htl
Where on-site treatment is not possible ’m ’silty clays will be excavated, then
transported in a sealed truck to an appropri 1~1y designed off-site treatment area for
neulralisation.
ASS Treatment On-Site
Any silty days exposed in the base of the basement excavation will require an
application of ag-lime at a rate of 5 kg/square metre.
. Where eXC<lvated silty clay soils are to be treated on-site, a suitably sized dedic.ated
treatment area will be created. Soils to be treated shall be placed on the treatment
area in layers not thicker than 0.3m.
Bunding will be constructed around the perimeter of the designated treatment area
to intercept and contain run-off from the area during the Soil treatment operations.
The base of the treatment area is to be lime treated prior to placement of each layer
of excavated material. Re-treatment with ag-lime is required prior to placement of
each new layer of excavated material to be treated, and at the conclusion of all
treatment. The base of the treatment pad shall have a minimum ag-lime application
of 5 kg/square metre.
.
Ag-lime will be applied evenly over the surface of the treatment area and thoroughly
blended into the ASS at a rate of 3 kg of ag-lime/tonne of dry silty clay soil. This
liming rate is based on a factor of safety of 1.5 and the use of good quality fine ag-
lime with a neutralising value of not less than 80 %.
When incorporation of the lime is complete, chromium suite validatien testing of the
treated spoil will be carried out to establish that sufficient ag-lime has been added to
neutralise the acid generation potential of the spoil. Where validation testing fails to
meet performance indicators, application of additional ag-lime will be required until a
satisfactory net acidity validation result has been achieved.
. Once ag-lime treatment is complete, the treated spoil may then be stockpiled for
later use or off-site disposal (as appropriate).
Should the proposed depth of disturbance extend below 2.5m in depth from surface
level, then additional ASS testing will be required.
Lime-treated, stockpiled soil shall have sediment fences and/or hay bales placed
downslope to intercept any eroded material. arthen bunds shall be constructed
downslope of stockpile areas to divert run-off/drainage to a collection sump. The
water quality of the sump is to be monitored against the water quality objective
Residential Development Appendix C
215-219 David Low Way, Peregian Beach Page 10f3
Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.