Residential Development
215-219 David Low Way, Peregian Beach
Draft Acid Sulfate Soil Management Plan (ASSMP)
Element Acid Sulfate Soil Management Plan
Tasks/Actions (cont’d) criteria for a Udal estuary,
ASS Treatment Off-Site
Where soils are required to be treated off-site, treatment of the soils will be undertaken
either: ,
,q." ,
~. .:f" -~f~l’ :- "
. in accqrg rice wittf’;!h,l;l~pr visions of this ASSMP for on-site treatment, modified as
neces.~ry for use ~f~n"accessible alternative off-site treatment area; or
. in acc6rqa,~c~,Withihe ~pp~ft,for the designated off-site treatment area.
.
Performance Indicators Retained Water :’" ’
; ’..
Laboratory testing of ~jwater encoQ’rite!e,d during basement excavation will be carried
out for pH, dissolved oxygen a.nJ! !uJbidit{..Vlese parameters will be assessed against
the equivalent water quality o i tiv : .t~ri.a;Cor a tidal_l}~tuary as follows:
.
pH ,’, p;S .5" ’..
"
~ * I’" >>, -
,
~
Disturbed Oxygen "/’S -100% sat ration,.
’: .
Turbidity 20NJV’ ,
Treated Soil ?~.i:’" ’J>"
’\:
Chromium suite testing carried out for validation of applied liming rates will be deemed to
be acceptable if the net acidity level recorded is < ,02%S.
FrequencylTiming Retained Water
Water quality within basement excavations will be monitored regularly during soil
removal and particularly following substantial rainfall events.
Treated ASS
The sampling and testing of any lime treated soils will be subject to validation testing at a
rate of one test per 400m3 of treated soil, which will be repeated until satisfactory results
are obtained.
Contingency Plan If lime trealment of soils is unsuccessful whereby performance targets are not being met
as indicated by the validation testing and water quality testing procedures then:
. the soil removal schedule will be reassessed and action taken to determine the
problems causing the unsuccessful performance;
. if the problems are related to ineffective implementation of the ASSMP, then the
plan will be audited by a person nominated by the project manager to ensure
improved implementation (monitoring and testing will be increased to ensure
compliance with the established standards); and
.
any significant changes to the ASSM P will be subject to discussions with the
relevant regulatory authorities.
Responsibi!ty The satisfactory implementation of the ASSMP by the contractor will be the
responsibility of the project manager, who will ensure:
. the contractor is made aware of site specific conditions and implications for the
management of sediments within the site;
. the contractor complies with the elements of the ASSMP and erosion control
measures proposed;
. correct methods for the collection of samples and testing are employed and that the
results are reported to the relevant site authorities; and
. corrective action measures proposed by the contractor are approved.
Responsibility (cont’d)
The contractor’s responsibilities will include:
. awareness of site conditions and requirements for the implementation of the
ASSMP;
Residential Development Appendix C
215-219 David Low Way, Peregian Beach Page 2 of 3
Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.