Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 103, section 1. The text section number identifies this passage in the reader.
. .
8 U T L E R
PARTNERS
Residential Development
215-219 David Low Way, Peregian Beach
Draft Acid Sulfate Soil Management Plan (ASSMP)
Element Acid Sulfate Soil Management Plan
. supervision of the mixing and soil amelioration pross;
. modification of earthworks/construction pro dures to comply with the ASSMP;
.
presentation of proposed corrective action measures (if required) which will then be
approved by,thll P!~ect m?l)ager. and
.
. implerrte;tfu’tion of ~~ P!9’v4d corrective actions.
Reporting The contra6tbr shall rep rt’to the project manager representative on:
! <’
\.~’..;:,.; i;""
. the effectiv h ss 005e operating strategies;
.
problems in imple~~nting the Asl~ jf(:.anagement strategies;
’,tl , ~
.
compliance with testing r~ if ri1~nt~, runl{)ff control.and materials handling; and
", "-’1/.,. . .
. effectiveness of any corr qvll <!ct\qry:adopted:;,’ .
.1..’ ,,’.’0’
,ll
,i lS
,t~,.#.,,’("
’.of
t;{’:’
’’;::’’
:
Residential Development Appendix C
215-219 David Low Way, Peregian Beach Page 30f3
Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.