               6.1.4       Existing Heath Wetland

              The existing wet heath wetland is to act as a buffer to the Noosa National Park. The
              Wetland System provides an ecological buffer to pest flora entering the Noosa National
              Park.


    6.2        Proposed Treatment Train

              This sub-section describes the proposed treatment train for stormwater management
              associated with the    operating phase of the developed site. The development is
              proposed to be completed in 3 stages.     Specific stormwater control will be instated for
              Stage 1 only, with the remainder of the stormwater devices being installed at Stage 2 for
              both the Stage 2 and Stage 3 development.


              The treatment units include Rainwater Tanks, Vegetation Buffers, Bioretention Trenches
              and include the environmental buffering provided by the existing Heath Wetland system
              for assimilation of stormwater into the                                               receiving environment.   The treatment train
              sequence is shown in Appendix B as follows:


               6.2.1       Stage 1     -  Southern Section (Only)


              Southern Section


              1.     Direction of flow from the Commercial area (restaurant roof, tank) into Bio-retention
                                                                                           ’

                     C1a.
              2.     Dire~tion of flow from the offsite commercial area, ar-park and on-site commercial
                     area   (restaurant podium) into Bio’::~tention C1a
              3.     Direction of sheet flow from th~ ~outhern catchment (the "South balance@ into Bio-
                     retention C1 b;                                                 ...



              4.     Direction of flow from shacks (ro s, tanks) into Bio-retention C1 b;
              5.     Direction of flow from bio-retention C1a to bio-retention C1b;
              6.     Direction of flow from Bio-retentio~ C 1 b into Heath Wetland;
              7.     Capture of sheet-fow from the northern and mid catchments using a Swale or catch
                     drain, directed to Bio-retention"C1b                                                 .il


                                                                                                            t’
                                                              _,p~_i""’..._
                                                                              ,-   _.~_""~.......,.,.,,!;,,,i;t~!
               6.2.2       Stage 2 & 3

              Northern Section


              1.     Direction of flow from the North balance into the Bio-retention A 1;
              2.     Direction of flow from the roof and rainwater tank of Building A into Bio-retention A 1;
              3.     Direction of flow from shacks (roofs,tanks) in the north section into Bio-retention A 1;
                     and
              4.     Direction of flow from the Bio-retention A 1 north trench into the Heath Wetland


              Mid section


              1.     Direction of flow from the Mid balance into the Bio-retention B 1;
              2.     Direction of flow from the roof and rainwater tank of Building B into Bio-retention B1;
              3.     Direction of flow from shacks (roofs,tanks) in the mid section into Bio-retention B1.
              4.     Direction of flow from the Bio-retention B1 mid trench into the Heath Wetland;


              Stormwater that has passed through all these treatment units enters the receiving node
              (Appendix B).          The design stormwater quality passing through the treatment units, as
              well   as    into the receiving node, for each stage of development, was modelled                                                     using
              MUSIC Version 4.




    @2012 Simmonds & Bristow Pty Ltd                                    Contrast Constructions                               J-1 005-310   22 March 2012
                                                                                                                                           -




    1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
    SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                            Page 10 of 24

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.