6.1.4 Existing Heath Wetland
The existing wet heath wetland is to act as a buffer to the Noosa National Park. The
Wetland System provides an ecological buffer to pest flora entering the Noosa National
Park.
6.2 Proposed Treatment Train
This sub-section describes the proposed treatment train for stormwater management
associated with the operating phase of the developed site. The development is
proposed to be completed in 3 stages. Specific stormwater control will be instated for
Stage 1 only, with the remainder of the stormwater devices being installed at Stage 2 for
both the Stage 2 and Stage 3 development.
The treatment units include Rainwater Tanks, Vegetation Buffers, Bioretention Trenches
and include the environmental buffering provided by the existing Heath Wetland system
for assimilation of stormwater into the receiving environment. The treatment train
sequence is shown in Appendix B as follows:
6.2.1 Stage 1 - Southern Section (Only)
Southern Section
1. Direction of flow from the Commercial area (restaurant roof, tank) into Bio-retention
’
C1a.
2. Dire~tion of flow from the offsite commercial area, ar-park and on-site commercial
area (restaurant podium) into Bio’::~tention C1a
3. Direction of sheet flow from th~ ~outhern catchment (the "South balance@ into Bio-
retention C1 b; ...
4. Direction of flow from shacks (ro s, tanks) into Bio-retention C1 b;
5. Direction of flow from bio-retention C1a to bio-retention C1b;
6. Direction of flow from Bio-retentio~ C 1 b into Heath Wetland;
7. Capture of sheet-fow from the northern and mid catchments using a Swale or catch
drain, directed to Bio-retention"C1b .il
t’
_,p~_i""’..._
,- _.~_""~.......,.,.,,!;,,,i;t~!
6.2.2 Stage 2 & 3
Northern Section
1. Direction of flow from the North balance into the Bio-retention A 1;
2. Direction of flow from the roof and rainwater tank of Building A into Bio-retention A 1;
3. Direction of flow from shacks (roofs,tanks) in the north section into Bio-retention A 1;
and
4. Direction of flow from the Bio-retention A 1 north trench into the Heath Wetland
Mid section
1. Direction of flow from the Mid balance into the Bio-retention B 1;
2. Direction of flow from the roof and rainwater tank of Building B into Bio-retention B1;
3. Direction of flow from shacks (roofs,tanks) in the mid section into Bio-retention B1.
4. Direction of flow from the Bio-retention B1 mid trench into the Heath Wetland;
Stormwater that has passed through all these treatment units enters the receiving node
(Appendix B). The design stormwater quality passing through the treatment units, as
well as into the receiving node, for each stage of development, was modelled using
MUSIC Version 4.
@2012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1 005-310 22 March 2012
-
1:ICLlENTFILESIContrast Constructionsl1108-155c -
Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc Page 10 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.