Southern Section
1) As per stage 1, without the swale for the capture of sheet-flow from the northern
catchment areas
6.3 Modelling of the Stormwater Treatment Train
Version 4 of the Model for Urban Stormwater Improvement Conceptualisation (MUSIC
v4) has been utilised to predict the performance of the proposed stormwater treatment
train. The use of Version 4 of the MUSIC model has been maintained due to the timing
of the submission of the original application (prior to the release of Music V5). Modelling
for both Stage 1 only and the complete development has been conducted to ensure that
the proposed treatment system will be effective at all stages.
Music model parameters have been developed and agreed to by the stormwater experts
(David Bristow and Neil Collins) as part of the Planning and Environment court appeal
(Appeal No: 2587 of 2008) concerning the development.
In addition to load reduction predictions a ’no worsening’ case has been applied,
comparing the predicted discharge from the undeveloped site with the development
stages.
6.3.1 Existing Development ’~----."’~
The site is presently developed as a caravan~park (the Peregian Beach Caravan Park),
with approximately two thirds of, the existing site "Qeing
cleared for caravans and
camping, consisting of mown grass, urder a light canopy of Broad-leaved Paperbark
(Me/aleuca quinquenerva). ,
Land uses in the Peregian Beach Village area surrounding the proposed development
site includes retail and businesses, facilities, a kindergarten, and the Noosa
~portiljlg
National Park. I
There is currently no stormwater qualityl’improvement’ or treatment devices installed at
the existing caravan park. Modelling has been conducted to provide a baseline to allow
the comparison of the performance on aevelop {’"stormwater system to the existing
case. The stormwater system must achieve both the quality objectives in Table 3-1 and
a ’no worsening’ of pollutant loads on the national park.
Table 6-2: MUSIC Model Results -
Undeveloped Site
Water Quality Indicator Result
Estimated long-term load (kg/year) % reduction Load (kg/year)
Suspended Solids 0 2170
Total Phosphorus 0 5.1
Total Nitrogen 0 30
6.3.2 Stage 1 Modelling
Results of MUSIC modelling showed that there will be no net increase in stormwater
Loads of sediment, total nitrogen and total phosphorus will be
runoff from the site.
substantially removed from stormwater before entering the Noosa National Park
(Appendix B).
@2012 Simmonds & Bristow Pty LId Contrast Constructions J-1 005-31 0 - 22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c -
Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc Page 11 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.