Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
,
.
The SECP also coordinates stormwater management with construction milestones, for effective
implementation of sediment erosion and control measures during the construction phase.
The plan layout of the SECP in the proposed development area is shown in Drawings 1108-
155C-01-07 and 11 08-055C-01-08 (Appendix E), which shows where erosion management
structures need to be placed during construction activities. Slope-related erosion hazard areas
within the development site were identified from the topographic map (Drawing J-1 005-31 0-09
in Appendix C), and represent control points within the construction site where particular care
will be needed. The management actions for controlling erosion of the site, and movement of
sediment and nutrients from the site, are described in Table 8-2. The detail management plans
for sediment and erosion control are described in Appendix E.
Table 8-2: Sediment and Erosion Control for Construction of the Essence of Pere ian
Management Action Description J.::
EP-SECP-01 Up-slope stormwater flow diversion.
EP-SECP-02 Site entry and exit points.
EP-SECP-03 Designated on-site stockpiles and waste receptacles.
EP-SECP-04 Down slope sediment controls.
EP-SECP-05 Maintaining ground cover.
’;
,PJ
.r~ ~"
.\
l
l.,
.~"-""""--__!!.-~
.
.,.’
11: l
f.., ,.~_ j
"
I,
~!Ji
’’Ilo-l f,
u
)
I~
\.~’-
.
".. \
~ >
)
~1
\
I’
’1 ~
I i
,II..’: I !
) .~
a;: ’:t’ .
I ..l"~ .
~ y ~~~
-<M_. """
"" iC.......,."""_..".....-..-~._~riilrl,r.;-
.1
,r~~ ~,_~
,,’r.Y,\
"._,;,;,,::_.
~
~..~:)~.~
@2012 Simmonds & Bristow Pty LId Contrast Constructions J-1005-310 -
22 March 2012
I :ICLlENTFILESIContrast Constructionsl1108-155c -
Essence of Peregian SCEP Stage 1 Updatel09 _
Output Documentsl1108-155C SWMP
_
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc Page 15 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.