Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

.   ’




        9.0         INSTALLATION SEQUENCE


        The installation sequence refers to implementation of the sediment and erosion controls during
        construction. The installation sequence described in Table 9-1 includes management actions
        detailed in EP-SECP-01 to -05 (Appendix D).


                                    atlon Sequence for the Essence 0fPereglan Deve opment
                    Table 91 I nstaII.
                                -




                         Item                           Drawing                                         Installed                 Removed

        Mark out initial limits of
                                                     Appendix D                             Before site disturbance.
        disturbance

        Install upslope flow
        diversions around area of
                                                                                                                            After surface ground
        disturbance, and down-                       Appendix D                             Before site disturbance.
                                                                                                                            cover is established.
        slope sediment control
        points
        Install access point on un-
        named road off David Low                     Appendix D                             Initiation of the project
        Way
        Clear access track                           Appendix D                         Before installing site office.

        Clear stockpile area                         Appendix D                         Before installing site office.
                                                                                            _,           -   ~   ...




        Install site office                          Appendix D                             Before building activity.

        Install waste areas and
                                                                                                                           After building activity
        stockpile sediment and                       Appendix D                         "   Before building activity.
                                                                                                                                 is complete.
        erosion controls.

                                                                                             After flow diversions,
                                                                                                  sediment control     .




                                                                                                   1
        Building activity.                           Appendix D                         "structures, access track,
                                                                                          stockpile are~, and site
                                                            ".R....~..,._-’
                                                                          ",J
                                                                              ._~’"
                                                                                        office-have’been installed.
                                                        r,’                      0"

                                                            .’1"        ’~~             Re-establish ground cover
        Install surface ground                                                           in development sub-areas
                                                     Appendix D                                  within 2 weeks after
        cover    (gardens)
                                                                                                       disturbance.




        @2012 Simmonds & Bristow Pty LId                                         Contrast Constructions                    J-1005-310   _
                                                                                                                                            22 March 2012
        I :ICLlENTFILESIContrast Constructionsl11 08-155c   -
                                                                Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl1108-155C SWMP
                                                                                                                                        _




        SCEMP_Scanlon Property Group_V40_ta_120321.doc                                                                                      Page 16 of 24

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.