EP-SMP-06: Maintaining the Bioretention Trenches
6. Frequency/Deadlines 1) Plastic litter, accumulated sediment (including silt) and coarse
particulates: Monthly.
,
"1, 2)Vegetative cover & weeds: Monthly.
3)Water-logging: Monthly.
7. Responsibilities Site manager.
~ Landscape contractor.
8. Reporting and 1) The accumulation of sediment and coarse particulates reported to the
Review ~. site manager, and if necessary to senior management;
~
\1.. 2) The need to restore vegetation or remove weeds reported to the site
"
,. ~-, manager, and if necessary to senior management.
., ;
"
,
,
t.
,
~
.:iI 3) Evidence of excessive water logging or elongated water holdup reported
.’i\.
-
to the site manager, and if necessary, to senior management
w,~.~ _
9. Contingency ~ )1. :.:. When loss of control of stormwater flow through the Bioretention Trench
~
~
occurs:
.
..
"
"
~
.’
\
11’
. 1) Inform site manager, and request maintenance support;
, ’. ’i..
"
.
"
[ .
-",.,> ’
"
,
2) Redirect surface water flow to bypass damaged Bioretention Trench, and
J,’ ~
< ,
cr. direct flow into alternative Bioretention Trench;
{ ~ 1’"t
" :~ (’.~, -:
~
.,
r ,
..
3) Implemrnt corrective actions when trench has dewatered;
"
I ’
"’
4)InvestiQate possible problems with pipework (EP-SMP-07).
10. Corrective actions 1) Remove litte/land accumulated sediment;
~
~
2) Remove silt drapes by rake and spade;
I
,
~ ,
3) Remove detritu~ from outlet weir grate;
..
~
i ,
~
_ 1
,
. 3) Restore vegetatioq if required by transplanting bare patches;
,
11 ’
EI -,
..
4) Remove weeds marually. I
’. , ~’.I!
5) Replace trench media and re-plant
".
...
EP-SMP-07: Maintaining the pipe infrastructure
1. ObjectiveslTargets Transfer stormwater between treatment units
2. Management Strategy Appropriately sized pipe-work to allow unimpeded flow between treatment
units.
3. Tasks/Actions 1) Inspect flows entering and exiting pipe-work during flow events. Impeded
flow will cause back-up of water and slow drainage at outlet pipes; and
:
,
2) Inspect for wet patches, surface erosion, subsidence on the ground
surface caused by leaking underground pipe-work.
4. Periormance 1) Flow along pipe-work;
Indicators
2) Evidence of leaking pipe-work
5. Monitoring 1) Entry and exit of water along pipe-work; and
2) Surface expression of water leaking from underground pipes.
6. Frequency/Deadlines 1) Flow along pipe-work: During stormwater flow events; and
2) Evidence of leaking pipe-work: Daily site inspection.
7. Responsibilities Site manager
Plumbing subcontractor
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.