Skip to the record
For the highest quality transcripts.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 61, section 1. The text section number identifies this passage in the reader.

EP-SMP-06: Maintaining the Bioretention Trenches

6. Frequency/Deadlines                                                                                 1) Plastic litter, accumulated sediment (including silt) and coarse
                                                                                                       particulates: Monthly.
                     ,
                                                                                              "1,      2)Vegetative cover & weeds: Monthly.
                                                                                                       3)Water-logging: Monthly.
7. Responsibilities                                                                                    Site manager.

                                                                                          ~            Landscape contractor.
8. Reporting and                                                                                       1) The accumulation of sediment and coarse particulates reported to the
Review                                                                                            ~.   site manager, and if necessary to senior management;

                                                  ~
                                                                                   \1..                2) The need to restore vegetation or remove weeds reported to the site
                                                                                              "


                             ,.                                                    ~-,                 manager, and if necessary to senior management.
   .,                                                                                         ;
                             "
       ,


                             ,
                                                  t.
                                                             ,
                                                                              ~
                                                                                       .:iI            3) Evidence of excessive water logging or elongated water holdup reported
                                          .’i\.
                                                                              -
                                                                                                       to the site manager, and if necessary, to senior management
                                                                         w,~.~            _




9. Contingency                                                           ~         )1. :.:.            When loss of control of stormwater flow through the Bioretention Trench
                                                                                       ~

                                                                                                  ~
                                                                                                       occurs:
                                                            .
                                                                                   ..
                                            "
                                          "
                     ~
   .’
                              \

                                                             11’
                                                                                   .                   1) Inform site manager, and request maintenance support;
                             ,         ’.       ’i..
             "
                                                                   .



                         "
                             [            .
                                                -",.,> ’
                                                           "


                                                                                   ,
                                                                                                       2) Redirect surface water flow to bypass damaged Bioretention Trench, and
            J,’                            ~
             <           ,
                                                           cr.                                         direct flow into alternative Bioretention Trench;
  {                                                    ~               1’"t
   "                     :~          (’.~,                                        -:
             ~
             .,
                                          r                                               ,
                                                                                          ..
                                                                                                       3) Implemrnt corrective actions when trench has dewatered;
                              "

                                                                                                                 I               ’


                                     "’

                                                                                                       4)InvestiQate possible problems with pipework (EP-SMP-07).
10. Corrective actions                                                                                 1) Remove litte/land accumulated sediment;
                                                                                                                          ~
                                                                                                                                                 ~
                                                                                                       2) Remove silt drapes by rake and spade;
                                                                                                                                                      I
  ,
                                              ~        ,
                                                                                                       3) Remove detritu~ from outlet weir grate;
                                       ..
                                                                   ~
                     i                                     ,

   ~
        _        1
                                      ,
                                                       .                                               3) Restore vegetatioq if required by transplanting bare patches;
                         ,
                 11               ’
        EI                                         -,

                                                             ..
                                                                                                       4) Remove weeds marually.                           I
  ’.         ,               ~’.I!




                                                                                                       5) Replace trench media and re-plant
                                                                                                                                                 ".

                                                                                                                           ...




EP-SMP-07: Maintaining the pipe infrastructure

1. ObjectiveslTargets                                                                                  Transfer stormwater between treatment units

2. Management Strategy                                                                                 Appropriately sized pipe-work to allow unimpeded flow between treatment
                                                                                                       units.

3. Tasks/Actions                                                                                       1) Inspect flows entering and exiting pipe-work during flow events. Impeded
                                                                                                       flow will cause back-up of water and slow drainage at outlet pipes; and
                                                           :

                             ,
                                                                                                       2) Inspect for wet patches, surface erosion, subsidence on the ground
                                                                                                       surface caused by leaking underground pipe-work.

4. Periormance                                                                                         1) Flow along pipe-work;
Indicators
                                                                                                       2) Evidence of leaking pipe-work
5. Monitoring                                                                                          1) Entry and exit of water along pipe-work; and
                                                                                                       2) Surface expression of water leaking from underground pipes.
6. Frequency/Deadlines                                                                                 1) Flow along pipe-work: During stormwater flow events; and
                                                                                                       2) Evidence of leaking pipe-work: Daily site inspection.
7. Responsibilities                                                                                    Site manager

                                                                                                       Plumbing subcontractor

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.