Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 62, section 1. The text section number identifies this passage in the reader.
~
~
EP-SMP-07: Maintaining the pipe infrastructure
8. Reporting and 1) Plumbing subcontractor to report the cause of blockage or leak to site
Review manager; and
2) Site manager to report major problems to senior management.
9. Contingency When loss of control of stormwater flow through the pipes occurs:
’_-,
1) Inform site manager, and request maintenance support;
2) Cease water flow through damaged pipe system from upstream overflow
~--~ points, by redirecting overflow into alternative drainage networks;
,
, ~
.... ’",
’1’ J
3) Implement corrective actions.
10. Corrective actions 1) Remove any visible blockages to inflow pipes after flows have ceased;
;~ .;.
2)Call plumbing subcontractor to inspect pipes for blockages and remove
0
’0
blockage as required;
~
"j
0’ ’"
3) Call plumbing subcontractor to inspect leaking pipe and repair leak;
" :>
r
{1
_.
"
4) Remove causative agent (nearby tree, hazard) that caused the blockage
~.,
,
~:
..\
or leak.
~ .. ~.
;;,;} ,
I -:~-,~’-:,
,
f :’
,
\,
\....
... ’"
""i"
,
’"
~" ~ "’.
,~ ~
too
~ .
,
"
!j ~ ~,
- ,. ,..
" ,,,
/ ~
t
. ,~_...r-
./ ~,,,’ .
’1! ~_""""’’’_’~.~_
1’;:4 ~_
~ :r
"’i! -
j’
t1 ~~ ~: F ~
"
.
..,’ ~ ____
~~_ _.,.,...r.~__.=51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.