Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 64, section 1. The text section number identifies this passage in the reader.

    EP-SECP-01: Up:.slope stormwater flow diversion
                                                                                                                                                          ,,,"                &




    1.0bjectiveslTargets                                                                                                               To reduce the transport capacity of stormwater crossing the building site

    2. Management Strategy                                                                                                             1)Divert up-slope stormwater around the building site;

                                                                                                                                       2) Divert stormwater around areas of soil disturbance; and
                                                                                                                 ’




                                                   ~:
                                                                           q                  ~
                                                                                                  I;
                                                                                                          r....’..;,;                  3) Divert stormwater onto stable ground or areas where suspended
                                                                                                                                       sediment can settle.

    3. Tasks/Actions                                                                                                                   Building site
                                                                                                               o+,~
                                                                                       ;<:.                              fj.
                                                                                                                                       1) Construct a perimeter bank along the upslope (eastern)edge of the
                                                                                                          .                            development to divert flow around the building site, and onto grassed or
                                                               .!.._
                                                                           :t..~’ ~                          .




                                                                                                                                       stabilised surfaces on the edge of the building site;
                                              i’           ~




                                                                                                                                       2) Stabilise the perimeter bank with erosion mats (e.g.jute mesh mat
                                                                                                             "          .~             anchored by cold anionic bitumen emulsion); and
                          ..,.
                                 "
                                              ~..,:",".              ’c. f< ;,?                            c.,~~,’
                                        .1"

                            ."
                                                                 ,
                                                                              ~                        \’,.1:"             1           Erosion prone hot-spots
                           ,.                                                                     _’              "~

                                  IIiIt
                                                                 ~’:’--"                          .;I~"
                                                           ~
                                                                 ..~:
                                                                                        ~
                                                                                                          ~.
                                                                                                                                       3) Place geo-Iogs/straw wattles within the building site, upslope of areas of
                                                                                                T
                                                          ""
                                                                                         i::....!l,’"
                                                                                                  ’
                                                                                                                                       high disturbance or high erosion hazard. Direct flow onto grassed or
                                                                                                                                       stabilised ground. Ensure secure pegging of geo-Iogs to prevent flow under
                                                           .’~
                             ’’’’f};l         ~I
                                                                 ~
                                                                                                                                       the log. The edge of the geo-Iog needs to overlap the stable or grassed
       ~~~
                                  .

                                        Ji~                                t~!
                                                                                         ~N                                    ":"::
                                                                                                  ,


                                                                                                                                       surface.
                                                                                                       o’

    4. Periormance                                                                              r                ;
                                                                                                                                       1) Effective diversion of stormwater away from the building site, and in
    Indicators                                                                                                                         particular away from reas of high erosion hazard;
                                                                                                                                                                     I
                                                                                                           6
                                                                                                                                       2) No evidrnce of soil’erosion on site, such as rills or sheet erosion.
    5. Monitoring                                                                                 ..                                   1) Inspect the structural integrity of the perimeter bank and geo-Iogs;

                                                                                                                                       2) Inspect the ground ~l:Jrface for erosion;
                                                                                                                                                                                      1\::
                                                                                                                 .~
      ~
           ~
                                                                                                                 ,       (
                                                                                                                                       3) Inspect performance of the geo-Iog during a stormwater event (low
                                                   ~
                                        .                                                                                              turbidity of diverted water, no erosion under the geo-Iog;
      ,

                                                                                                                                                                     Jf
                                                                                                                                       4) Effective direction , diverted water onto grassed or stable ground).
    6. Frequency/Deadlines                                                                                                             1) Structural integrity’& evidence of erosion: daily
                                                                                                                                                                 .

                                                                                                                                                                                  ~          ,




                         "X]
                                                               ~,’1                    ~.
                                                                                                       I:!~
                                                                                                                                       2) Performanc::e uring stormwater event: During significant stormwater
                                                                                                                                                                          ’
                                        :t           "




                                                                                                                                       events.

    7. Responsibilities                                                                                                                Building contractor.
    8. Reporting and
    Review
                                                                                                                                       Exception reporting to the site manager and senior management.

    9. Contingency                                                                                                                     When loss of control of the upslope flow diversion occurs:
                                                                                                                 ~.

                                                                                                                                       1) Inspect existing structure for points of failure;
      ,.

                        ~
                                              ~                                r~                                                      2) Report situation to site manager immediately, and request support;
                                                                          ~
               ..,-..
                                      Cj’
                                                                                                "
                                                                                                                                       3) If feasible redirect flow away from the point of failure onto stable ground;
                    ~

                                                    ~
                                                                                                                                       5) Bridge points of failure with stable material (e.g. sandbags);
                                                                                                             .t’
                                                                                                                                       6)Collect water quality samples at inflow and outflow points (section 11)
    10. Corrective actions                                                                                                             1) If necessary remove sediment mobilised on road surfaces with a spade
                                                                                                                                       and broom. Do not use water.
                   ~

           i~                                                                                                        :t                2) Repair perimeter bank: reinstall berm, secure the jute mat.
                                                                                              i:I.                i’:
                                                           m’                            ~.ol         ~     J!
~
                                                                                                                                       3) Repair or replace geo-Iogs if damaged. Securely peg to the ground to
                                                                       ’!t~x.
                                                                                                .




                        ,                                                                                 :;.           ,,-,

      -
                    ~                                                                                                                  ensure no flow under log.
               ,                                                     j"
       c.                                                                      I\,\_
                         "
                                                i
                                              ,                                        ,


            ’’:;        iooliJ            !
                                                                                                          ~                            4)Add a second geo-Iog 1 to 4m upslope if necessary;
                                 l;
                                                                                       -

                                                                                                       i!F
            :                         i:~-"
                   1(1: r.
                                                                                                                                       5) Improve the stability of ground surface that receives diverted water.
               ~
                                 :l’                                                                                                   Refer to EP-SECP-05.

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.