4) Rills on the building site: after stormwater events; and
c
.;t., 5)Suspended solids in water entering and exiting the site: during
,
stormwater events.
7. Responsibilities Building contractor.
8. Reporting and Exception reporting to the site manager and senior management.
Review or.
~;
,
~",.,
9. Contingency When water is flowing over unstable ground:
,
, l
..
,
:~) .,
:Xi ’"
:(
..Ii?’
]1’>"1 1) Use sandbags to divert flow from upstream away from unstable ground
; "r-o,
onto stable ground;
.
"
, 3) Cover the point of failure using erosion mats;
,
"
,
4)Collect water quality samples at inflow and outflow points (section 11);
~
~ ’-,~ ’
,.1
!
i".1~
"
0-
, 5) Report situation to site manager;
r
;
""\~ ."1 -(
~.. ..,. .,’ " .
6)Implement corrective actions.
10. Corrective actions 1) Building contractor to reinforce the need for managing off site movement
of disturbed soil because of the high environmental values associated with
... "’"
0’1, r,
, _j,’ Noosa National Park;
.\ ,
,
,
"1’
.<zlC
I ’:/
-
;,,) ~
:{: :>Ii’ .;{j.> ,
2) Ensure that erosion mats are intact and properly installed;
f’1l ..
’J
",:i1
~i, I"!J I:il r.c
.’...
~ iI’~ , ~1.,..
’
j,,,
~
.. .,
3) Ensure that re-seeding and irrigation is occurring. Install additional
erosion m~ts. grass cover, or turf if necessary.
EP-SECP-06: Stabilizing soil stockpiled for Stage 2 development
1. ObjectivesfTargets To avoid
mobilisiq,g soi stockpiled inJhe Stage 2 development.
2. Management Strategy 1) Minimise exposute of unstable soil in ~tockpiles and disturbed ground. ’r ",
3. Tasks/Actions 1) Install up-slope stormwater flow diversi~n (refer to EP-SECP-01);
2) Install down-slope sediment control (refer to EP-SECP-04
,,;H
~
.
.
.,
3) Use an erosion mat as a temQorary measure to cover unconsolidated
sediment when building the stockpile. Cover if rain is imminent. or when the
~
;. .\
..
stockpile is left.overlJjght. Peg dO"1l the edges of the erosion blanket.
’~
’- I.
)0
~!j
.. .,
4) Reseed stockpiled soils using hydro-mulch or equivalent. Lightly irrigate
":i
I";
~~
’~~: ,(J.
o..:~. :;
reseeded area daily for four weeks to establish the grass surface.
.;.0;
;.:.’ ). ftl
-,
4) Lay turf in areas down-slope of the stockpile where concentrated flow is
"
.oJj ~"
~
~
expected (e.g. at the overflow of sediment fences).
4. Performance 1) Stockpile covered with erosion mat (short term disturbance) or reseeded
Indicators grass (longer term after disturbance); and
ID!,,"’;;
2) Lack of surface erosion.
5. Monitoring 1) Temporarily disturbed ground is covered with erosion mats;
~
2) Reseeding and irrigation of bare ground is occurring;
3) 100% vegetation cover 4 weeks after establishment;
~
4) Rills are not present on the building site;
"’r
~ ,
5) Suspended solids in water exiting the site are not excessively higher than
water entering the site.
6. Frequency/Deadlines 1) Cover with erosion mats: daily;
2) Cover with grass: weekly;
c
..
,
r:.:
r:i’~
3) Reseeding and irrigation schedule is being maintained: daily;
y- m
4) Rills on the building site: after stormwater events; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.