EP-SECP-04: Down slope sediment controls
3) Suspended solids of stormwater flowing into and out of the building site:
-
7
,.
during stormwater events.
4) Inspection of temporary downpipe connection: after roof installation.
7. Responsibilities Building contractor.
8. Reporting and
Exception reporting to the site manager and senior management.
Review
9. Contingency When significant loss of sediment down-slope is occurring:
.,,", ,
"
1) Report situation to site manager immediately, and request support;
’..." (’," ,
’<
2) Divert flow upstream away from point of failure;
-
"
!II., ""
,.
,
...:~:
,
,
!>’
3) Bridge the point of failure using sandbags;
,
, ""_, ~ y
A \ t~
4) Collect water quality samples at inflow and outflow points (section 11);
"
~,
~ ,1 .l
!f:
5) Inform relevant authorities;
, \ ,. "
, ’tt;:-
6)Implement corrective actions.
.
10. Corrective actions 1) Improve ground cover if rills are evident;
:’;’ ,.,.... 2) Repair sediment fences;
~;
~
’t tit :l’ io_
3) Remove sediment from sediment fences and stockpile (refer to EP-
_^
Qil -
’\
~_.;
"
J:
~ t;
SECP-03)for later use as topsoil; and
d~ ; ~’f? ~ ~~ rl-.
"’u , . .J ~~
5) Install temporary downpipes promptly. :.
EP-SECP-OS: Maintaining ground cover
1. Objectivesrrargets To avoid erosion of soil from the building site.
2. Management Strategy 1) Minimise exposure of unstable soil in stockpiles and disturbed ground.
3. Tasks/Actions 1) Maintain existing grass c ver as much as possible;
3;
2) Cover disturbed gr.ound under erosion blanket, secured with pegs and
r; "<"
..
"
1!j
.
with the edge buried below the soil surface.
;1
’
_
L
~ ~
~ l’’\!
L 3) Reseed disturbed soils that will be left bare, using hydromulch or
’J,
L
"J’!
, equivalent. Irrigate reseeded_area daily for four weeks to establish the
!
";}~
’:
~, :.YIJ
’"
,
. grass surface.
~
-
. f
.,
~\’fj :’r~ I... 4) Lay turf in areas where concentrated flow is expected (e.g. at the
.:lI
"" "
overflow of sediment fences).
4. Performance 1) Lack of ground cover kept to a minimum;
Indicators
1’1’-
2) Ground covered with remnant grass (undisturbed state), erosion blankets
: . ’iH
,
(short term disturbance) or reseeded grass (longer term after disturbance);
.
..
:,-,
i"
r.~~’ , and
..
",’!’;’ ~
3) Lack of surface erosion.
.
5. Monitoring ,
1) Temporarily disturbed ground is covered with erosion mats;
,
2) Reseeding and irrigation of bare ground is occurring;
.
0
~
,
’-
" 3) 100% vegetation cover 4 weeks after establishment;
-
~ -"’ID!
.1.. 4) Rills are not present on the building site;
~ F
~
-
.,
"’,L.. D 5) Suspended solids in water exiting the site are not excessively higher than
1"’;" ’ol
water entering the site.
6. Frequency/Deadlines 1) Cover with erosion mats: daily;
;.~ " .-
2) Cover with grass: daily;
\ i
3) Reseeding and irrigation schedule is being maintained: daily;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.