Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 68, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                              .^




EP-SECP-04: Down slope sediment controls

                                                                                                                               3) Suspended solids of stormwater flowing into and out of the building site:
                                        -
                      7


                       ,.
                                                                                                                               during stormwater events.
                                                                                                                               4) Inspection of temporary downpipe connection: after roof installation.
7. Responsibilities                                                                                                            Building contractor.
8. Reporting and
                                                                                                                               Exception reporting to the site manager and senior management.
Review

9. Contingency                                                                                                                 When significant loss of sediment down-slope is occurring:
                                                                                                         .,,",       ,



                                                                                               "
                                                                                                                               1) Report situation to site manager immediately, and request support;
           ’..."                          (’,"                            ,
                                                                                                   ’<


                                                                                                                               2) Divert flow upstream away from point of failure;
                   -




                                                                                                                       "
                       !II.,     ""
                                                      ,.
                                                                                                         ,
                       ...:~:



                               ,
                                                                                     ,

                                                                                                   !>’
                                                                                                                               3) Bridge the point of failure using sandbags;
           ,
           ,                                          ""_,      ~                y
                               A      \                                                                t~
                                                                                                                               4) Collect water quality samples at inflow and outflow points (section 11);
                                                            "
                                                                                             ~,
                ~                   ,1                         .l

                                            !f:
                                                                                                                               5) Inform relevant authorities;
                                      ,         \                                ,.                              "


            ,         ’tt;:-

                                                                                                                               6)Implement corrective actions.
                                                                                             .




10. Corrective actions                                                                                                         1) Improve ground cover if rills are evident;
                                                           :’;’                                                  ,.,....       2) Repair sediment fences;
                                                                                                                     ~;
                   ~
  ’t                                                        tit                          :l’       io_
                                                                                                                               3) Remove sediment from sediment fences and stockpile (refer to EP-
       _^




                           Qil                                                                                      -




  ’\
            ~_.;
                   "
                      J:
                                                                                               ~ t;
                                                                                                                               SECP-03)for later use as topsoil; and
      d~           ;                        ~’f?                                 ~             ~~ rl-.


  "’u            ,                                         .                 .J       ~~
                                                                                                                               5) Install temporary downpipes promptly.         :.




EP-SECP-OS: Maintaining ground cover

1. Objectivesrrargets                                                                                                          To avoid erosion of soil from the building site.

2. Management Strategy                                                                                                         1) Minimise exposure of unstable soil in stockpiles and disturbed ground.
3. Tasks/Actions                                                                                                               1) Maintain existing grass c ver as much as possible;

                                                            3;
                                                                                                                               2) Cover disturbed gr.ound under erosion blanket, secured with pegs and
           r;              "<"
                                          ..
                                                                  "
                                                                            1!j
                                                                                                                 .

                                                                                                                               with the edge buried below the soil surface.
                                     ;1
                                                  ’


                                                                                                                                              _
                                                                                                                                                          L
                                                                                                                                      ~                               ~
                            ~                    l’’\!
                                    L                                                                                          3) Reseed disturbed soils that will be left bare, using hydromulch or
                                   ’J,
                                                 L
                                                       "J’!
                                                                                                                           ,   equivalent. Irrigate reseeded_area daily for four weeks to establish the
  !
                                                                            ";}~
                                                                            ’:
                                                                            ~, :.YIJ
                                                                                             ’"
                                                                                                             ,
                                                                                                                   .           grass surface.
                                                                                 ~
                                                                                         -
                                                                                               .                   f

                 .,
                                                                ~\’fj            :’r~ I...                                     4) Lay turf in areas where concentrated flow is expected (e.g. at the
  .:lI
                                ""                                                            "
                                                                                                                               overflow of sediment fences).

4. Performance                                                                                                                 1) Lack of ground cover kept to a minimum;
Indicators
                                                                             1’1’-
                                                                                                                               2) Ground covered with remnant grass (undisturbed state), erosion blankets
                                    :                          .                     ’iH
                                                                                                          ,
                                                                                                                               (short term disturbance) or reseeded grass (longer term after disturbance);
                                                                .
                                    ..

                                               :,-,
                                                                                     i"
                                                                                               r.~~’                   ,       and
                                          ..


                                                                  ",’!’;’                                    ~




                                                                                                                               3) Lack of surface erosion.
                            .




5. Monitoring                                                                                ,
                                                                                                                               1) Temporarily disturbed ground is covered with erosion mats;
                                                                                         ,
                                                                                                                               2) Reseeding and irrigation of bare ground is occurring;
       .




                                                                          0
                                        ~
                                          ,
                                                           ’-
                                                                                               "                               3) 100% vegetation cover 4 weeks after establishment;
                                                                                                                       -

                                ~                                                    -"’ID!
                                                                    .1..                                                       4) Rills are not present on the building site;
                      ~                                                     F




                   ~
                                          -




                                                 .,
                                                                     "’,L..                              D                     5) Suspended solids in water exiting the site are not excessively higher than
                                                       1"’;"        ’ol
                                                                                                                               water entering the site.

6. Frequency/Deadlines                                                                                                         1) Cover with erosion mats: daily;

                ;.~                                                                            "                 .-
                                                                                                                               2) Cover with grass: daily;
  \                                         i


                                                                                                                               3) Reseeding and irrigation schedule is being maintained: daily;

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.