Skip to the record
Search everything, all in one place.

Council archive · source document

Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 76, section 1. The text section number identifies this passage in the reader.

                                                                                         =




SECTION 1                 INTRODUCTION
                          .




1.1     Project

It is understood that it is proposed to develop the site by the construction of a residential development partly

suspended over a single level basement carpark at approximately RL 4.0m to RL 6.1m, involving approximately
2m maximum depth of bulk excavation. The location of the site and a potential layout for the development are
shown approximately on Drawing No. 1 attached.


1.2       Proposed Scope of Work

It was anticipated that the site ground conditions might comprise fill material, sands and silts overlying estuarine

clays. Based on the scope of the proposed development, the anticipated ground conditions and the
requirements of Sections 6 to 8 of the State Planning Policy 2/02 Guidelines                Planning & Managing
                                                                                             -




Development Involving ASS, it was proposed to investigate the site at the same time as (but separate from) an
Environmental Site Assessment (ESA)by:


.
      collecting samples at 0.25m intervals from six bores to a depth of 2.5m, or prior refusal;
      conducting acid sulfate soil (ASS)screening tests on all samples recovered from the bores;
.
      undertaking Chromium Suite laboratory testing on selected soil samples; and
.     preparation (if required) of an Acid Sulfate Soils Management Plan (ASSMP).

1.3       Commission


Based on the proposed nature of the development, the anticipated subsurface conditions and the scope of work,
a   fee to undertake the assessment was presented in a proposal of 23 March 2007.                  Butler Partners was

subsequently commissioned by Scanlon Properties Ply LId to undertake the assessment as proposed.




Residential Development                                                                                    Page 10t10
215-219 David Low Way, Peregian Beach
Project No. 07160                                                                                          18 June 2007

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.