Council archive · source document
Response to Information Request - Received on 19/04/2012 · OPW11/0335
Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 77, section 1. The text section number identifies this passage in the reader.
BUT L E R
PARTNERS
SECTION 2. THE SITE
2.1 Site Description
At the time of investigation the site was developed as a caravan park. A one and two storey ’Manager’s
Residence/Office’ and a single storey ’Amenities Block’ were located on the eastern side of the site, with the
remainder of the site comprising caravan parking areas surrounded by grassed areas with medium to tall trees
and a gravel and partly paved ’ring-road’ around the site. Ground surface levels reduce non-uniformly across
the site from east to west from a high at David Low Way of approximately RL10m to a low along the western
boundary of approximately RL2.5m. Three general views of the site at the time of the investigation are given in
Photographs 1 to 3.
Photograph 1: General view of the site looking north from the south-easlern comer
-
Photograph 2: General view of the site looking north from the south-western corner
Residential Development Page 2 of 10
215-219 David Low Way, Peregian Beach
Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request - Received on 19/04/2012Related documentApplication case desk ↗
About this file
- File size
- 89.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.