Council archive · source document
Attachment 2 - Traffic Report · MCU13/0251
APPENDIX B: PAGE 2 OF 5: JOINT EXPERT REPORT FROM PREVIOUS APPROVAL 13.s.12.5 Page - 13 [OCR of page images] HEH T CHE HOLLAND TRAFFIC CONSULTING [2 APPENDIX B: PAGE 2 OF 5: JOINT EXPERT REPORT FROM PREVIOUS APPROVAL Discussion of Traffic Engineering Issues in Dispute 1. Impacts of Generated Traffic The traffic engineers are reliant on manual traffic counts undertaken in May 2007 at the site access intersection and automatic traffic counts undertaken around the Heron Street roundabout in January 2009. It was noted that the 2007 afternoon peak counts probably did not commence until sometime after the actual afternoon peak period. The traffic engineers have interpreted this basic data, and made projections of design traffic generations of the subject development and of future traffic volumes. The traffic report originally submitted in support of the application estimated future background traffic growth as 5 percent per annum. It was agreed that such a growth rate is unreasonably high, and that it would be more reasonable to assume background traffic growth of 3 percent per annum, or 33 percent between 2009 and 2020, the appropriate traffic design horizon. The basic data and the future traffic estimates made by the two engineers are set out in the attached Table 1. It will be noted that Mr Beard’s future traffic volume estimates through the subject intersection are only marginally different from those prepared by Mr Holland. The estimates of design traffic generations made by the two engineers are substantially similar, although there is slightly greater difference between the estimates of turning traffic volumes without the subject development, particularly in the afternoon peak period. : Both engineers have assessed the future performance of the site access intersection with David Low Way using the SIDRA Intersection analysis package. Mr Holland assessed the future performance of the site access intersection with the subject development as satisfactory, based on the use of design gap acceptance parameters of: critical gap 5.0 seconds, follow-up headway 3.0 seconds, based on his interpretation of Table 13A.1 of Chapter 13 of the DMR Road Planning & Design Manual, and the recommendations of the Austroads publications “Guide to Traffic Engineering Practice”. Mr Beard assessed the future performance of the site access intersection with the subject. development as unsatisfactory, based on the default gap acceptance parameters used in the SIDRA package for the nominated intersection geometry, a different interpretation of Table 13A.1 referenced by Mr Holland, and Table 4.3 from Austroads Guide to Traffic Engineering Practice Part 5 — Intersections at Grade. He believes that the SIDRA default values (7.0 seconds and 4.0 seconds respectively) are generally appropriate, and considers that the minimum values which could be reasonably assumed at the subject intersection are: critical gap 6.0 seconds, and follow-up headway 4.0 seconds. The differences between the assessments made by Mr Holland and Mr Beard depend more on the assumptions as to the gap acceptance parameters than they do on their traffic volume forecasts. 13.8.12.5 Page - 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Traffic ReportRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.