Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Amended Stormwater Plan

Attached to the e-mail Information Request Response REC16/0014.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                        9




3.3.2.2 Treatment Nodes
The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s
before discharging into the Elkhorn Drive drainage system.


    Bio-Retention Basin – An area of 70m2 designated Bio-retention to treat road, landscape, and roof
    catchments to achieve the WQO’s was modelled. An extended detention depth of 200mm with a filter
    media of 200mm/hr sandy loam hydraulic conductivity has been modelled. The location of this device
    is shown on the attached Appendix A.



3.3.3    Effectiveness in Pollution Reduction
The water quality development model was set up with the incorporation of the above devices to reduce
pollutant export to WQO levels. Table 3.5 indicates the predicted pollutant mean values of stormwater
discharged from the site as calculated by MUSIC:


                                   Pollutant                 Percentage Load Reduction

                        Total Suspended Solids (TSS)                  82.8%

                            Total Phosphorus (TP)                     62.4%

                              Total Nitrogen (TN)                     49.9%

                           Gross Pollutants (>5mm)                     100%

                                   Table 3.5 - Flow Based Pollutant Load Reduction



The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP
and TN generated by stormwater runoff in accordance with the targets required under the water quality
objectives stated previously.
Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.