Amended Stormwater Plan

Attached to the e-mail Information Request Response REC16/0014.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                     10



4.0 Stormwater Quantity Management
4.1      Background
The proposed sub-division and associated increase in impervious areas has the potential to create or
exacerbate drainage problems to downstream areas and/or drainage infrastructure. The purpose of this
section of the SWMP is to determine the general requirements for bulk stormwater management for the
proposed development. The design shall ensure that rainfall event discharges are conveyed from the site
in a manner that complies with Council’s stormwater planning guidelines and does not result in a worsened
drainage situation to downstream infrastructure, without causing a nuisance or annoyance to
residents/property owners.


Under existing conditions the subject site has a catchment crest beginning approximately 88m east off the
south-western corner, to approximately 36m east off the north-western corner. The western portion of the
catchment sheet flows over the west boundary into the neighbouring lot. The eastern portion of the
catchment sheet flows east into Noosa River Esplanade. Refer to Figure 4.1 on the following page.


4.2      Site Drainage Constraints and Opportunities
4.2.1    Drainage Constraints
No lawful point of discharge exists to the downstream western or eastern properties. Earthworks to the
western boundary to achieve grade out to the new road must be minimised to avoid large height retaining
walls.


4.2.2    Drainage Opportunities
It is proposed to discharge all roof areas to a lawful point of discharge (the new road kerb and channel),
and the new road will provide a formal underground drainage downstream to an existing connection in
Elkhorn Drive. Ground areas of Lots 1-5 will sheet flow over the western boundary, and ground areas of
Lots 6-11 will sheet flow into the new road. The drainage system from Elkhorn Drive to Noosa River
Esplanade will be upgraded to cater for the proposed development. This proposal will ensure a situation of
non-worsening discharge to the downstream boundary conditions.
Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.