Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 13 ‘A’ Roof 100 0.018 ‘B’ Roof 100 0.018 ‘C’ Roof 100 0.018 ‘D’ Roof 100 0.018 ‘E’ Roof 100 0.018 Roof 100 0.018 ‘F’ Hardstand 100 0.030 Landscape 0 0.012 Roof 100 0.018 ‘H’ Hardstand 100 0.030 Landscape 0 0.012 Roof 100 0.018 ‘I’ Hardstand 100 0.030 Landscape 0 0.012 Roof 100 0.020 ‘J’ Landscape 0 0.071 Roof 100 0.018 ‘K’ Hardstand 100 0.014 Landscape 0 0.008 Roof 100 0.018 ‘L’ Hardstand 100 0.015 Landscape 0 0.011 Road 100 0.118 ‘M’ Landscape 0 0.078 Elkhorn Dr Total Catchment (Ha) 70 0.641 Roof 100 0.032 ‘G’ Landscape 0 0.366 Eastern Boundary Total Catchment (Ha) 8 0.398 Table 4.2 – Post-Development Catchment Areas
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.