Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 14 Catchment Name Description % Impervious Area (Ha) Hardstand 100 0.046 ‘A’ Landscape 0 0.016 Hardstand 100 0.043 ‘B’ Landscape 0 0.015 Hardstand 100 0.039 ‘C’ Landscape 0 0.015 Hardstand 100 0.031 ‘D’ Landscape 0 0.012 Hardstand 100 0.030 ‘E’ Landscape 0 0.012 Western Boundary Total Catchment (Ha) 70 0.259 Table 4.2 – Post-Development Catchment Areas (Cont’d) 4.2.1 Peak Flow Rates The results in Table 4.3 & 4.4 demonstrate that a situation of non-worsening can be achieved to both the east and west downstream boundary conditions. Refer to Appendix A for details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.