Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 16 5.0 Conclusions This report has outlined a total water cycle strategy to be adopted in the construction and operational works phase of the development which satisfies the acceptable solutions set out in Councils planning scheme policies. Wastewater minimisation strategies will be adopted to reduce the demand on Council’s existing infrastructure, Best practice and practical water quality improvement devices are proposed which include a Bio- retention Basin areas totalling 70m 2, A situation of non-worsening can be achieved to the downstream boundary conditions. This is achieved by reducing the existing catchment areas to the west, maintaining existing conditions to the east, and providing a formal underground drainage system to an existing manhole in Elkhorn Drive. The existing manhole in Elkhorn Drive to the outlet into Noosa River Esplanade will require upgrading to cater for the additional catchment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.