Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 15 3 Storm Flow Rate to Catchment Boundary (m /s) Event Western Eastern ‘A’ ‘B’ ‘C’ ‘D’ ‘E’ ‘F’ ‘G’ 39% AEP 0.039 0.016 0.014 0.012 0.019 0.01 0.066 Q2 ARI 18% AEP 0.052 0.022 0.019 0.016 0.026 0.014 0.089 Q5 ARI 10% AEP 0.072 0.03 0.026 0.022 0.036 0.019 0.123 Q10 ARI 5% AEP 0.084 0.035 0.031 0.026 0.042 0.022 0.144 Q20 ARI 2% AEP 0.101 0.042 0.037 0.03 0.05 0.027 0.172 Q50 ARI 1% AEP 0.128 0.053 0.047 0.039 0.064 0.034 0.217 Q100 ARI Table 4.3 – Pre-Development Peak Flow 3 Storm Flow Rate to Catchment Boundary (m /s) Event Western Eastern ‘A’ ‘B’ ‘C’ ‘D’ ‘E’ ‘F’ ‘G’ 39% AEP 0.015 0.012 0.01 0.005 0.01 0 0.059 Q2 ARI 18% AEP 0.02 0.016 0.013 0.006 0.014 0 0.08 Q5 ARI 10% AEP 0.028 0.021 0.018 0.009 0.019 0 0.111 Q10 ARI 5% AEP 0.033 0.025 0.021 0.01 0.022 0 0.129 Q20 ARI 2% AEP 0.041 0.032 0.027 0.01 0.028 0 0.154 Q50 ARI 1% AEP 0.054 0.042 0.036 0.01 0.038 0 0.195 Q100 ARI Table 4.4 – Post-Development Peak Flow
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.