Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 23 column 1 column 2 Outcome Specific Outcomes Probable solutions (if code assessable) Provided Water reuse S1.1 Development complies with the water S1.1 – Complies, refer SWMP O1 Development uses a combination of detention quality standards in Table 2 of the SEQ and retention systems to capture run-off from areas on the site; Regional Plan Implementation Guideline No. AND 7 for Water Sensitive Urban Design; O2 Water storage devices must have sufficient S2.1 No solution provided S2.1 – No stormwater harvesting is capacity having regard to local rainfall pattern and proposed due to type of development and the catchment area of roof or other hard standing Council preference surface; S3.1 Captured water is plumbed to be S3.1 – No stormwater harvesting is available for all external uses including proposed due to type of development and AND gardening, irrigation, ponds, filling swimming Council preference O3 Captured water is utilised for all non-potable pools and outdoor cleaning, as well as all uses on site; ground floor toilet cisterns and washing machine cold taps;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.