Amended Stormwater Plan

Attached to the e-mail Information Request Response REC16/0014.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                       24



                        column 1                                       column 2                                        Outcome
                    Specific Outcomes                   Probable solutions (if code assessable)                        Provided
                                                       AND
                                                                                                        S3.2 – N/A
                                                       S3.2 Where the captured water is used for
  AND                                                  toilet flushing and/or laundry use, an
                                                       automatic or manual interchange device that
                                                       allows alternate use of captured water or the
                                                       reticulated water supply is installed to
                                                       ensure that there is a continual supply of
                                                       water for sanitary flushing and laundry use.

  O4     On-site detention does not adversely impact   S4.1 No solution provided                        S4.1 – Detention is not required due to
                                                                                                        proposed upgrades of the downstream
  on water requirements downstream of the site                                                          drainage network
  where the water is required to sustain the ecology
  and hydrology of downstream systems
  (environmental flows);
                                                                                                        S5.1 – N/A
  AND
  O5 Within the Shire Business Centre site, as         S5.1 No solution provided
  shown on Map SBC, on-site detention measures
  are contained within the developed areas of the
  site, clear of drainage lines and Open Space
  Precincts.
Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.