Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 24 column 1 column 2 Outcome Specific Outcomes Probable solutions (if code assessable) Provided AND S3.2 – N/A S3.2 Where the captured water is used for AND toilet flushing and/or laundry use, an automatic or manual interchange device that allows alternate use of captured water or the reticulated water supply is installed to ensure that there is a continual supply of water for sanitary flushing and laundry use. O4 On-site detention does not adversely impact S4.1 No solution provided S4.1 – Detention is not required due to proposed upgrades of the downstream on water requirements downstream of the site drainage network where the water is required to sustain the ecology and hydrology of downstream systems (environmental flows); S5.1 – N/A AND O5 Within the Shire Business Centre site, as S5.1 No solution provided shown on Map SBC, on-site detention measures are contained within the developed areas of the site, clear of drainage lines and Open Space Precincts.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.