Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Amended Stormwater Plan

Attached to the e-mail Information Request Response REC16/0014.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                          3




1.0 Introduction

1.1      Background
This report is to accompany and be considered part of an application to Noosa Council for a proposed sub-
division at 28 Elkhorn Dr, Tewantin.


1.2      Scope
Empire Engineering Pty Ltd was commissioned by Elkhorn Investments (QLD) Pty Ltd to develop a site based
Stormwater Management Plan (SWMP) to outline water management strategies for the proposed development
that will comply with Council’s relevant planning scheme policies, Queensland Development Code and the
Environmental Protection Act (1994) and associated Environmental Protection (Water) Policy 1997.


This report presents the results of a SWMP and outlines the proposed measures to be adopted in relation to
stormwater quality management and stormwater quantity management for the subject site and the proposed
development.


1.3      Existing Topography
The subject site is described as Lot 70 M37807 with a combined area of 12,938m2. The site is bounded by
Elkhorn Drive and existing residential allotments to the south, existing residential allotments to the west and
north, and Noosa River Esplanade to the east. The site is currently occupied by a single residential house with
an associated shed. The remainder of the lot is covered in grass and tree/shrubbery. See Figure 1.1.
Log in to download the original file

Amended Stormwater Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.