Original source · versioned page text
Amended Stormwater Plan
Attached to the e-mail Information Request Response REC16/0014.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 5 2.0 Water Cycle Management 2.1 Background The purpose of this section of the SWMP is to outline water saving measures that will be implemented in the design and construction of the proposed development. 2.2 Wastewater Minimisation To reduce the impact of water demand from the development and to minimise the loading on the existing sewerage network, it is intended to reduce the wastewater leaving the site through the use of “at source” measures. This will include: Water saving shower roses with a AAA rating or better Dual flush toilet cisterns that do not exceed 6 litres on full flush and 3 litres on half flush The use of 3 star (or higher) water efficient appliances 2.3 Stormwater Harvesting Tanks The developer has not opted in to stormwater harvesting tanks.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.