Skip to the record
The gold standard in government transparency.

Council archive · source document

MCU21.0117 OPW21.0199-Att 3 Landscape · MCU21/0117

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ZEST BUILDING DESIGN


[OCR of page images]
Landscape Maintenance Plan
BELVEDERE ON PEARL

2. SCHEDULE OF MAINTENANCE WORKS

The following schedule summarises the minimum landscape maintenance tasks and timing requirements for
the various categories of maintenance activities. Allowance should be made for maintenance according to
seasonal conditions.

LANDSCAPE MAINTENANCE SCHEDULE

CATEGORY art CS) TIMEFRAMES / FREQUENCY

 

3
g
2 o ¢£ 3
£Fre€é& g g
s|5) & g\f = Specification
S=aaceks«-
1. Weeding Weed garden areas manually or with A Prior approval required for Herbicideuse.
approved herbicide Approved Herbicide use to be in accordance with
regulation rates and manufacturer's
recommendation.
Protect plants from overspray and avoid if rainis
likelywithin 12 hour period
2. Leaf Litter Do not remove leaf litter from planted A
Removal areas unless depth of litter is impacting on
plant growth
Removeleaf litter from pathways
3. Mulching Reapply mulch to maintain to a depth of A Leaflitter mulch (20-40mm)
75mm
4. PlantFertiliser —_Fertilise all plants at specified rates based A Prior approval required for fertiliser use.
on isciltesting resulta Slow release fertiliser N:P:K ratio— 18:3:10 at
manufacturer's recommended rate per plant.
Initial fertilising at planting based on soil testing
results
Fruittreesin Apply’ Osmocote Plus Trace Elements-Fruit Initial fertilising at planting based on soil testing
containers & Citrus’ in August/September and A A results,
February.
5. Pest& Disease Check for incidence of fungal and insect A
Control attack
Avoid use of chemical sprays A Prior approval required of chemical to be applied
Apply appropriate treatment for fungal and
insect attack if necessary subject to approval
6. Pruning &
Trimming
-Climbers Prunelong leaders which cannot be A
reattached to climbing frame
-Shrubs& Tip prune to encourage density. Length A A A
groundcover removed depending on vigour of previous
plant growth
-Trees including Remove deadwood and tip prune fruit trees A Notifyin writing to the Body Corp Managementany
FruitTrees if required perceived need for tree structural work
7. PlantRemoval __ Inspect for failed or dying plants requiring A
&Replacement replacementand record probable cause
Replant after dead or failed plant removal A Densities, sizes & species used are to be in
accordance with those specified in Landscape Plan
Looo
8. Weed Control Remove weeds from turf areas manually or A Prior approval required for Herbicideuse.
in Turf with approved herbicide in accordance with

manufacturer's recommendation

ZEST BUILDING DESIGN

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Att 3 Landscape.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.