Council archive · source document
MCU21.0117 OPW21.0199-Att 3 Landscape · MCU21/0117
ZEST BUILDING DESIGN [OCR of page images] Landscape Maintenance Plan BELVEDERE ON PEARL 2. SCHEDULE OF MAINTENANCE WORKS The following schedule summarises the minimum landscape maintenance tasks and timing requirements for the various categories of maintenance activities. Allowance should be made for maintenance according to seasonal conditions. LANDSCAPE MAINTENANCE SCHEDULE CATEGORY art CS) TIMEFRAMES / FREQUENCY 3 g 2 o ¢£ 3 £Fre€é& g g s|5) & g\f = Specification S=aaceks«- 1. Weeding Weed garden areas manually or with A Prior approval required for Herbicideuse. approved herbicide Approved Herbicide use to be in accordance with regulation rates and manufacturer's recommendation. Protect plants from overspray and avoid if rainis likelywithin 12 hour period 2. Leaf Litter Do not remove leaf litter from planted A Removal areas unless depth of litter is impacting on plant growth Removeleaf litter from pathways 3. Mulching Reapply mulch to maintain to a depth of A Leaflitter mulch (20-40mm) 75mm 4. PlantFertiliser —_Fertilise all plants at specified rates based A Prior approval required for fertiliser use. on isciltesting resulta Slow release fertiliser N:P:K ratio— 18:3:10 at manufacturer's recommended rate per plant. Initial fertilising at planting based on soil testing results Fruittreesin Apply’ Osmocote Plus Trace Elements-Fruit Initial fertilising at planting based on soil testing containers & Citrus’ in August/September and A A results, February. 5. Pest& Disease Check for incidence of fungal and insect A Control attack Avoid use of chemical sprays A Prior approval required of chemical to be applied Apply appropriate treatment for fungal and insect attack if necessary subject to approval 6. Pruning & Trimming -Climbers Prunelong leaders which cannot be A reattached to climbing frame -Shrubs& Tip prune to encourage density. Length A A A groundcover removed depending on vigour of previous plant growth -Trees including Remove deadwood and tip prune fruit trees A Notifyin writing to the Body Corp Managementany FruitTrees if required perceived need for tree structural work 7. PlantRemoval __ Inspect for failed or dying plants requiring A &Replacement replacementand record probable cause Replant after dead or failed plant removal A Densities, sizes & species used are to be in accordance with those specified in Landscape Plan Looo 8. Weed Control Remove weeds from turf areas manually or A Prior approval required for Herbicideuse. in Turf with approved herbicide in accordance with manufacturer's recommendation ZEST BUILDING DESIGN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21.0117 OPW21.0199-Att 3 Landscape.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.