Skip to the record
Search everything, all in one place.

Council archive · source document

MCU21.0117 OPW21.0199-Att 3 Landscape · MCU21/0117

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ZEST BUILDING DESIGN


[OCR of page images]
Landscape Maintenance Plan
BELVEDERE ON PEARL

CATEGORY art CS)

9. Turf Fertiliser

10. Turf Mowing

11. Turf
Decompaction &
Aeration

12. Turf
Replacement

Apply fertiliser at rates as recommended by
manufacturer

Mow frequency as specified according to
the season

Mow at heights of between 40 to-60mm &
remove no more than 1/3 of the leaf blade
at anyone time

Inspect for compaction and thatching

Carry out aeration treatment if required

Inspect for failed turf requiring
replacement and record probable cause

Remove failed turf, prepare surface & lay
new turf in accordance with original turf
specified in the landscape plan L.000

ZEST BUILDING DESIGN

>

Summer

D> autumn

Winter

TIMEFRAMES / FREQUENCY

As required

 

Specification

Prior approval required for fertiliser use.

Every 2weeks in summer

Every 3 weeks in spring & autumn
Every month in winter

Donot mow underwet conditions

Carry out with dethatching or verticutting
equipment

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU21.0117 OPW21.0199-Att 3 Landscape.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.