Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      29.     All easements for public or third party infrastructure must be in accordance with the
                              planning scheme and granted at no cost to the Grantee. Where the Grantee is Council
                              or a service authority, the easement documentation must be in accordance with the
                              Grantee’s standard easement terms. Draft easement documentation must be submitted
                              to Council for endorsement.
                      30.     All works must be kept clear of any existing or proposed easements for public or third
                              party infrastructure on the subject land, unless agreed otherwise in writing by the
                              Grantee.
                              Earthworks and Retaining Walls
                      31.     All earthworks and associated retaining structures/batters must be undertaken in
                              accordance with an Operational Works approval, and contained entirely within the
                              subject site unless written permission from the respective landowner(s) is provided to
                              Council.
                      32.     Earthworks carried out on site must not affect the structural integrity of any of the existing
                              buildings and/or services and/or structures and/or lands that border the development
                              site.
                              Damage to Services and Assets
                      33.     Any damage caused to existing services and assets as a result of the development
                              works must be repaired at no cost to the asset owner at the following times:
                              (a)      where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or
                              (b)      where otherwise, upon completion of the works associated with the development.
                              Any repair work which proposes to alter the alignment or level of existing services and
                              assets must first be referred to the relevant service authority for approval.
                              Outdoor Lighting
                      34.     Any outdoor lighting with the potential to affect surrounding residential premises shall be
                              designed, installed, operated and maintained in accordance with AS4282 “The Control
                              of the Obtrusive effects of Outdoor Lighting”.
                              Fencing and Walls
                      35.     Any street fencing to David Low way or Sandpiper Court must be set back an average
                              of 1 metre from the front property boundary. Any fencing on the front boundary must
                              either:
                              (a)      not exceed a maximum height of 1.2m;
                              (b)      be of open construction..
                              Street Identification
                      36.     The street address of the development must be clearly visible and discernible from the
                              primary frontage of the site by the provision of a street number and, where appropriate,
                              the building name.
                              Clothes Drying Areas
                      37.     Each dwelling unit in Stage 2 must be provided with access to an outdoor clothes line
                              which is screened from public view.




Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
Log in to download the original file

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement(PDF, 6MB).pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.