                                             summary contained within that document to confirm free draining outlets,
                                             within reasonable construction tolerance capabilities are achieved; and
                                       (v)   presentation of groundwater testing results which demonstrate that all parts
                                             of the treatment measures are located above seasonal high groundwater
                                             levels.
                                       A copy of the detailed civil drawings for the bio-retention system must be included
                                       as an appendix to the plan.
                              (i)      The plan must include a comprehensive Maintenance Plan for the detention tank
                                       and the bioretention system including the frequency of cleanout, methods of
                                       cleanout, and general maintenance. The plan will include the requirement for
                                       regular inspections and the keeping of records (to be maintained and made
                                       available to Council upon request). The plan is also to stipulate that all necessary
                                       improvements are required to be made immediately upon awareness of any
                                       deficiencies in the treatment measure/s. The detention tank is to be capped and
                                       trafficable.
                              (j)      The plan shall include details of the costs of maintenance (including periodic
                                       replacement of filter media) over the life of the asset.
                      23.     The Maintenance Plan (including costing) must be included in any Community
                              Management Statement for the site.
                      24.     The Body Corporate for the site must enter into a contract with a suitably qualified
                              contractor(s) for the maintenance of the stormwater quantity and quality devices and
                              provide evidence of both the contract and execution of the contract upon request by
                              Council.
                      25.     Prior to the commencement of use, certification is to be submitted to Council from a
                              suitably qualified stormwater quality specialist to verify that the bioretention works have
                              been constructed generally in accordance with the approved civil works plans,
                              conditions of approval and relevant sections of the Construction and Establishment
                              Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy Waterways
                              Partnership). Council approval of the constructed stormwater management system is
                              required prior to commencement of use.
                      26.     Certification is required to include all relevant items noted in Construction and
                              Establishment Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy
                              Waterways Partnership) including completed and signed forms.
                              Acid Sulfate Soils
                      27.     The application for operation works must include an Acid Sulfate Soil and Groundwater
                              Management Plan for the development prepared by a suitably qualified person and in
                              accordance with relevant State Government Policy and Guidance material to prevent
                              any impact to the receiving environment as a result of development within actual or
                              potential acid sulfate soils, and associated groundwater impacts. Detail design plans
                              provided with the application for operation works approval must demonstrate how the
                              bedding surrounding underground pipework will be managed to prevent continual
                              dewatering of groundwaters along it to the receiving environment, and how any impacts
                              to groundwater from proposed filling on potential or actual acid sulfate soils will be
                              managed.
                              Easements
                      28.     Unless otherwise agreed in writing by the relevant service provider, any public or third
                              party infrastructure located on the subject site must be placed within an easement
                              registered against the title of the property.




Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
Log in to download the original file

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement(PDF, 6MB).pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.