Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement

of 46

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                       (viii) air quality protection;
                                       (ix)    storage and handling of hazardous substances;
                                       (x)     noise and vibration management;
                                       (xi)    waste management;
                                       (xii) cultural heritage management;
                                       (xiii) visual amenity protection;
                              (e)      In particular, but without limitation, the EMP shall address the following issues in
                                       relation to the operational phase:
                                       (i)     legislative compliance;
                                       (ii)    water conservation;
                                       (iii)   water quality protection;
                                       (iv)    maintenance of Stormwater Quality Improvement Devices
                                       (v)     vegetation protection;
                                       (vi)    fauna protection;
                                       (vii) bushfire control;
                                       (viii) weed and pest control;
                                       (ix)    biting insects management
                                       (x)     waste management.
                      50.     The EMP shall be submitted to Council prior to or in conjunction with the lodgement of
                              any development applications for Operational Works for the Site. Operational Works
                              approval shall not be granted until the EMP is approved by the Coordinator of
                              Environment and Landscape. The Developer shall comply with the requirements of the
                              EMP.
                      Building Demolition/Removal/Relocation
                      51.     Where the development involves the removal, relocation or demolition of a building, a
                              Waste Management Plan (construction and demolition) shall be submitted and approved
                              by Council’s Environmental Health Officer prior to issue of a development permit for
                              operational works for demolition, removal or relocation of any building other than a shed.
                              The purpose of the Waste Management Plan is to facilitate the segregation of waste for
                              the effective reuse and recycling of such materials. Segregated wastes attract
                              significantly reduced disposal fees at the landfill with some items free. Higher gate fees
                              are charged for mixed waste.
                              Waste Management Plans (construction and demolition) are required to be submitted in
                              accordance with Planning Scheme Policy 11, Waste Management Plans.
                              Waste storage areas are to provide for adequate separation of all reusable, recyclable
                              and waste materials. These shall be located so that they are convenient and safe to use.
                              The Plan shall contain the following information:
                              (a)      The site area for the storage and separation of waste is to be shown on the plan
                                       drawings accompanying the application.
                              (b)      A waste management table as indicated below is to be completed showing how
                                       waste material is to be segregated - recycled – reused or disposed.
                              (c)      Table – Waste Management Table.




Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
Log in to download the original file

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement(PDF, 6MB).pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.