                                 MATERIALS ON-SITE                                         DESTINATION
                                                                              Re-use and Recycling                    Disposal
                                 Expected waste       Estimated     On-site              Off-site                *specify contractor
                                 materials            volume(m³)    *specify proposed *specify contractor        and landfill site or
                                                                    re-use or on-site and recycling outlet       other disposal site
                                                                    recycling methods
                                 Excavation
                                 material
                                 Green waste
                                 Bricks
                                 Concrete
                                 Timber-please
                                 specify
                                 Plasterboard
                                 Metals - please
                                 specify
                                 Asbestos
                                 Other - please
                                 specify
                              Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
                              completed by the demolition contractor.
                      Waste Storage
                      52.     The developer must provide waste storage and disposal facilities in accordance with
                              Planning Scheme Policy 9, Waste Management, including an external imperviously
                              paved area correctly sized for all refuse and recycling containers and suitably screened
                              from public places and neighbouring properties.
                      53.     A bin wash area is required with a cold-water tap, hose and drain outlet connected to
                              sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
                              to the sewerage system which can be achieved by a bunded area, with a nib wall height
                              of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²).
                              Alternatively, the waste area can be roofed, or any other appropriate design approved
                              by Council.
                      Noise
                      54.     Upgraded building envelope constructions and the provision of mechanical
                              ventilation/air conditioning which achieves the ventilation requirements of the Building
                              Code of Australia, in accordance with the Second Joint Report of Experts in Noise (30
                              May 2018) for Planning and Environment Court Appeal 4066 of 2017, including:
                              (a)      the facades of the Visitor accommodation Type 4 motel building facing towards
                                       the IGA building and IGA carparking area;
                              (b)      the facades of the Visitor accommodation Type 4 dwelling units facing towards the
                                       IGA building; and
                              (c)      the facades of the Visitor accommodation Type 4 dwelling units facing towards the
                                       hotel building, drive-through access road and drive-through bottleshop, and
                                       carparking areas.
                      55.     Prior to the commencement of use written certification is required from a suitably
                              qualified person confirming that upgrades to the building facades and provision of
                              mechanical ventilation/air conditioning comply with the recommendations of the Second
                              Joint Report of Experts in Noise (30 May 2018) for Planning and Environment Court
                              Appeal 4066 of 2017.




Document Set ID: 20933247
Version: 1, Version Date: 16/07/2019
Log in to download the original file

2019-09-30 Special Meeting Agenda - Item 1 - Attachment 4 - Court Judgement(PDF, 6MB).pdf · 6.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.