Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

engineering drawings

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                                                SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                1.   ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                                                                                                                                                                                                                     (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                1.   SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO
                                                                                                                                                                                                                                                                                                                                                                                                     INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                                                2.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL
                                                                                                                                                                                                                                                                                                                                                                                                     BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                3.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETE
                                                                                                                                                                                                                                                                                                                                                                                                     AND EFFECTIVE PRIOR TO:
                                                                                                                                                                                                                                                                                                                                                                                                     a. STRIPPING OF TOPSOIL AND GRASS.
                                                                                                                                                                                                                                                                                                                                                                                                     b. BULK EARTHWORKS TO THE SITE.




                                                                                                                                                                                                                                                                                                                                         BE
                                                                                                                                                                                                                                                                                                                                                                                                     c. SERVICES INSTALLATION.
                                                                                                                              PROVIDE TURFED CATCH DRAIN TO




                                                                                                                                                                                                                                                                                                                                            R
                                                                                                                                                                                                                                                                                                                                                                                                     d. PAVEMENT CONSTRUCTION




                                                                                                                                                                                                                                                                                                                                                      RI
                                                                                                                                                                                                                                                                     P
                                                                                                                              CONVEY CLEAN RUNOFF AROUND                                                                                                           SW                                                                                                                           5.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE




                                                                                                                                                                                                                                                                                                                                                         M
                                                                                                                              DISTURBED SITE AREAS AS PER                                                                                                                                                                                                                                            SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.




                                                                                                                                                                                                                                                                                                                                                          A
                                                                                                                                                                                                                                                                                                                                                                                                6.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWING
                                                                                                                              IECA STD DWG CD-01 & CD-03




                                                                                                                                                                                                                                                                                                                                                               RO
                                                                                                                                                                                                                                                                                                                                                                                                7.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION O




                                                                                                                                                                                                                                                 37.09
                                                                                                                                                                                                                                                                                        P
                                                                                                                                                                                                                                                                                      SW                                                                                                             THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.




                                                                                                                                                                                                                                                                                                                                                                 W
                                                                                                                                                                                                                                                                                                                                                                                                8.   IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION
                                                                                                                                                                                                                                                                                                                                                                                                     TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTRO
                                                                                                                                                                                                                                                                                                                                                                                                     PLANS. SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.

                                                                                                                                                                                                                                                                                                                                                                                                9.   OVERALL
                                                                     >         >         >                >     >      >     >       >       >          >        >         >       >         >           >       >                                                                                                                                                                                   a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                                                                                                                                                                                                                     b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE COMMENCING UP-SLOPE
PROVIDE SEDIMENT FENCING                                                                                                                                                                                                                                                                                                                                                                                EARTHWORKS.




                                                                                                                                                                                   Grate
                                                                                                                                                                                                                                                                                                                                                                                                     c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER MULCHED, COVERED WITH
                                                                 >
                                                           |S|




                                                                                                                                                                                                                            Grate
     TO DOWNSTREAM SITE                                                                                                                                                                                                                                                                                                                                                                                 EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.
 BOUNDARY AS PER NSC STD




                                                                                                                                                     Grate
                                                                 >




      DWG ESC-04 & ESC-05                                                                                                                                                                                                                                                                                                                                                                       SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                             P
                                                                                                                                                                                                                                                                                                                                     SW
                                                                                                                                                                                                                                                                                                                                                                                                10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING ESC-04 AND
                                                           |S|




                                                                                                                                                                                                                                                                                                                35.32
                                                                                                                                                                                                                                                                                                                                                                                                    ESC-05, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
                                                                 >




                                                                                                                                                                                                                 10                                                                                                                                                                                 DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.
                                                                                                                                                                                                               IL 0Ø
                                                                                                                                                                                                                 33 P
                                                                 >




                                                                                                                                                                                                                   .9 V C                                                                                                                                                                       TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                                                                                                                     8
                                                                                                                                                                                                                                                                                                                                                                                                11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD DRAWING
                                                           |S|




                                                                                                                                                                                                                                                                                                                             34.79
                                                                                                                                                                                                                                                                                                                                                                                                    ESC-01, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
                                                                 >




                                                                                                                                                                                                                                             10                                                                                                                                                     DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDIN
                                                                                                                                                                                                                                           IL 0Ø
                                                                                                                                                                                                                                             33 P
                                                                                                                                                                                                                                               .1 VC
                                                                                                                                                                                                                                                                                                                                                                                                    SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
                                                                 >




                                                                                                                                                                                                                                                 2
                                                           |S|




                                                                                                                                                                                                                                                                                                                                     34.26
                                                                                                                                                                                                                                                      P                  10                                                                                                                     CATCH DRAIN
                                                                                                                                                                                                                                                    SW              IL 0Ø                                                                                                                       12. FOR CATCH DRAIN STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALA
                                                                 >




                                                                                                                                                                                                                                                                      32 P
                                                                                                                                                                                                                                                                        .9 VC
                                                                                                                                                                                                                                                                          8
                                                                                                                                                                                                                                                                                                                                                                                                    (IECA) BEST PRACTICES STANDARD DRAWING CD-01 CATCH DRAINS AND CD-03 CATCH DRAINS - TURF LINED.
                                                                 >




                                                                                                                                                                                                                                                                                                                                                                                                GRASSED FILTER STRIP
                                                           |S|




                                                                                                                                                                                                                                                                                                                                                                                                13. FOR GRASS FILTER STRIP STANDARD DETAILS AND SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                                                                                                                                                                                                                    AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING GFS-01 AND GFS-02 GRASS FILTER STRIPS.
                                                                 >




                                                                                                                                                                                                                                                                                                                                                                                                REVEGETATION
                                                           |S|
                                                                 >




                                                                                                                                                                                                                                                                                                                                                                                                14. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA)
                                                                                                                                                                                                                                                                                                                                                                                                    BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION GENERAL.




                                                                                                                                                                                                                                                                                                       |S|
                                                                 >




                                                                                                                                                                                                                                                                                                                                                                                                OPERATION AND MAINTENANCE
                                                           |S|




                                                                                                                                                                                                                                                                                                                                                                                                15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:
                                                                 >
                                                   32.43




                                                                                                                                                                                                                                                                                       |S|                                                                                                          · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
                                                                         |S|             |S|                  |S|                                                    |S|               |S|               |S|            |S|                    |S|                                                                                                                                                  · WITHIN 24 HOURS OF EXPECTED RAIN; AND




                                                                                                                                                                                                                                                                                                                                                                   31.85
                                                                                                                                                                                                                                                                                                                                                                                                    · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SI
                                                                                                                                            31.90




                                                                                                                                                                                                                                                                              31.59
                                                                                                                                                                                                                                                                                                                                                                                                16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWI
                                                                                                                                                                                                 31.50


                                                                                                                                                                                                                                                                                                                                                                                                    TABLE:




                                                                                                                                                                                                                                                    2 x 100Ø PVC
                                                                                                                                                                                   31.84
                                                                                             31.39




                                                                                                                                                                                                                                                    IL32.07
                                    MH (Not Located)                                                                                                                                                                                                                                                                                                                                                                                   MAINTENANCE SCHEDULE
                                    Plotted from Unitywater




                                                                                                                                                                                                                                                                                             31.12
                                    Records                                                                                                                                                                                                                                                                                                                                                                                                                         TIMEFRAME FOR COMPLETION
                                                                                                                                                                                                                                                                                                                                                                                                                ESC MEASURES              MAINTENANCE TRIGGER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         OF MAINTENANCE
                                                                                                                                                                                                                                                                                                                                                                                                                SEDIMENT BASIN      WHEN SETTLED SEDIMENT EXCEEDS THE WITHIN 7 DAYS OF THE
                                                                                                                                                                                                                                                                                                                                                                                                               (WHERE UTILISED)      VOLUME OF THE SEDIMENT STORAGE       INSPECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                    ZONE (SEE COUNCIL'S SEDIMENT BASIN
                                                                                                                                                                                                                                                                                                                                                                                                                                           DESIGN GUIDELINES

                                                                                                                                                                                                                                                                                                                                                                                                              OTHER ESC MEASURES THE CAPACITY OF ESC MEASURES IS      BY THE END OF THE DAY
                                                                                                                                                                                                                                                                                                                                                                                                                                          EXCEEDED



                   PROVIDE SEDIMENT FENCING                                                                                                                                                                                                                                                                                                                                                     REPORTING
                        TO DOWNSTREAM SITE                                                                                                                                     PROVIDE TURFED FILTER STRIP                                                                                                                                                                                      17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR APPRO
                    BOUNDARY AS PER NSC STD                                                                                                                                    ALONG KERB DOWNSTREAM OF                                                                                                                                                                                             BY THE SUPERINTENDENT.
                                 DWG ESC-01                                                                                                                                    SITE AS PER IECA STD DWG GFS-01




                                                                                                                                                                                                                                                                                                                                                               LEGEND

                                                                                                                                                                               BOTTLEBRUSH AVE                                                                                                                                                       |S|                   SEDIMENT FENCE

                                                                                                                                                                                                                                                                                                                                                 >         >               DIVERSION SWALE

                                                                                                                                                                                                                                                                                                                                                                                                                                    SEDIMENT AND EROSION CONTROL:
                                                                                                                                                                                                                                                                                                                                                                           CONSTRUCTION ENTRY                                       CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                                    SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                                                                                                    WITH IECA AND NOOSA SHIRE COUNCIL POLICIES AND
                                                                                                                                                                                                                                                                                                                                                                           TURF FILTER STRIP                                        GUIDELINES



                                                                                                               North Point   Approved                                                                                                                                                                                                                             Project Address                                           Title
                                                                                                                                                                                                                                                                                                                                                                  37 BOTTLEBRUSH AVENUE                                     EROSION AND SEDIMENT CONTROL PLAN
 E    14.11.24   OPW AMMENDMENT                                                    TS                MP        N                                                                                                                                                                                                                                                  NOOSA HEADS
 D    15.03.23   RFI UPDATE                                                        BRP           NW                          For and on behalf of RECOR Pty Ltd.
 C    29.11.25   RFI UPDATE                                                        BRP           NW                          Scale                                                                                                                                  ENGINEERING & PROJECT SERVICES                                                                Client Details                                            Project Name                                                                       Sheet Size
                                                                                                                                                                                                                                                                       SUNSHINE COAST | BRISBANE
 B    10.10.22   RFI UPDATE                                                        BRP           NW                                          1:100           0   1    2        3       4m                                                                             www.recor.au | ABN 89 647 469 707                                                           S & J KNOBEL                                              RESIDENTIAL UNIT DEVELOPMENT                                                         A1
 A    12.05.22   MCU / OPW ISSUE                                                   BRP           NW                                                                                                                          COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                            Project Number                                                    Drawing Number    Revision

Rev   Date                    Revision Description                             Drawn Check                                                           DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                             client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
                                                                                                                                                                                                                                                                   'Issued For Construction' in the revision description.                                                                                                    20220051                                                         C20                  A
Log in to download the original file

engineering drawings.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.