Original PDF page 4, section 1. The text section number identifies this passage in the reader.
SEDIMENT
SEDIMENT RELEASE
RELEASE GUIDELINES
GUIDELINES 8. UP-SLOPE
IF SEDIMENT AND EROSIONCONTROLDEVICESHAVE BEEN
EARTHWORKS.
c. IN FOUND
AREAS WHERE TO BERUNOFF DIFFERENT OR FAILED
TURBIDITY IS TO BE IN CONTROLLED,
SERVICE,
1. ALL1.RELEASES
ALL RELEASES
OF STORMWATEROF STORMWATER
CAPTUREDCAPTURED ONSITE,
ONSITE, UNLESS CORRECTIVE
EXPOSED ACTIONTO
SURFACES IS TO
BE BE UNDERTAKEN
EITHER MULCHED, IMMEDIATELY
COVERED WITH
OTHERWISEUNLESS OTHERWISE
NOTED NOTEDIN THIS
IN THIS STANDARD, MUST STANDARD,
NOT EXCEED MUST NOT
THE WHICH CONTROL
EROSION MAY INCLUDE AMENDMENTS'
BLANKETS OR TURFEDADDITIONS TO THE
IF EARTHWORKS
FOLLOWINGEXCEED THE FOLLOWING LIMITS:
LIMITS: ORIGINAL
ARE EXPECTED APPROVED EROSIONFOR
TO BE DELAYED CONTROL
MORE PLANS.
THAN 14SUCH
DAYS.
· 50mg/L· OF50mg/L OF TOTAL
TOTAL SUSPENDEDSUSPENDEDSOLIDS SOLIDS
(TSS)(TSS)
AS AS A MAXIMUM
A MAXIMUM AMENDMENTSARE TO BE APPROVEDBY SUPERINTENDENT,
CONCENTRATION;
CONCENTRATION; SEDIMENTIFFENCEDEEMED NECESSARY AND RELEVANT.
· TURBIDITY
· TURBIDITY (NTU) VALUE(NTU)LESS VALUE
THANLESS THAN BACKGROUND;
10% ABOVE 10% ABOVE 9. SEDIMENT
10. FOR OVERALL FENCE STANDARDDETAIL AND SPECIFICATION
· pH VALUE BACKGROUND;
MUSTBE IN THE RANGE6.5 TO 8.5 EXCEPTWHERE,AND REFER a. TO
TEMPORARY
INTERNATIONAL DRAINAGE CONTROL
EROSION CONTROLFLOWS SHOULD BE
ASSOCIATION
1.5m STAR PICKETS AT MAX. TO ·THE pH VALUE
EXTENT MUSTTHE
THAT, BE NATURAL
IN THE RANGE 6.5 TO
RECEIVING 8.5 EXCEPT
WATERS LIE AUSTRALASIADIVERTED (IECA)AROUND THE WORKSTANDARD
BEST PRACTICES SITE WHERE POSSIBLE.
DRAWINGS
WHERE,
OUTSIDE THIS RANGE. AND TO THE EXTENT THAT, THE NATURAL b. ALL DRAINAGE,
SF-01 AND SF-02 SEDIMENT FENCE. EROSION AND SEDIMENT CONTROLS TO
2.5m CENTRES RECEIVING WATERS
1 METER MAX. STAR PICKETS
TIMBER SPACER TO SUIT KERB-SIDE INLET 2. THE CONCENTRATION OF TSSLIE OUTSIDE
RELEASED BYTHIS RANGE. MAY
DEWATERING BE INSTALLED
TEMPORARY CONSTRUCTION ENTRY/EXIT AND BE OPERATIONAL BEFORE
2. THE CONCENTRATION OF TSS
ONLY EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED RELEASED BY DEWATERING
AND COMMENCINGENTRY
11. FOR CONSTRUCTION UP-SLOPE / EXITEARTHWORKS.
STANDARD DETAIL AND
500 - 600mm
DROP INLET MAY ONLY EXCEED
SUPPORTED THROUGH DOCUMENTATION THAT: 50mg/L WHERE IT CAN BE c. IN AREAS WHERE
SPECIFICATIONREFER TO INTERNATIONAL RUNOFF TURBIDITY IS TOCONTROL
EROSION BE
SELF-SUPPORTING WITH GRATE · FURTHER DEMONSTRATED
SIGNIFICANT RAINFALL AND IS SUPPORTED
FORECAST TO THROUGHOCCUR CONTROLLED, EXPOSED SURFACES
ASSOCIATIONAUSTRALASIA(IECA) BEST PRACTICESSTANDARD TO BE EITHER
GEOTEXTILE DOCUMENTATION
BEFORETHE TSS CONCENTRATION THAT: IS LIKELYTO BE REDUCEDTO DRAWINGS MULCHED,
EXIT-01AND COVERED WITH EROSIONEXIT
EXIT-02CONSTRUCTION CONTROL
- ROCKPAD
OW
WIRE OR STEEL MESH 50m· FURTHERSIGNIFICANTRAINFALLIS FORECASTTO OCCUR BLANKETS
(CONSTRUCTION OR TURFED IF EARTHWORKS
SITESONLY),EXIT-03- ROCKPADSFOR ARE EXPECTED
BUILDING
DIRECTION OF FL (14 GAUGE x 150mm · g/L; BEFORE THE TSS CONCENTRATIONIS LIKELY TO BE TO BE DELAYED FOR MORE THAN
SITESAND EXIT-04AND EXIT-05CONSTRUCTIONEXIT - VIBRATION 14 DAYS.
OPENINGS) WHERE REDUCED TO 50m
GEOTEXTILE IS NOT · RELEASINGA HIGHER CONCENTRATIONOF TOTAL SUSPENDED GRID.
· g/L;
SOLIDSWILL RESULTIN A BETTERENVIRONMENTAL OUTCOMEBY KERBSEDIMENT
INLET FENCE
SELF-SUPPORTING · RELEASING
PROVIDING STORAGEAFOR HIGHER CONCENTRATION
THE CAPTURE AND TREATMENT OF TOTALOF 10. FOR
12. FOR KERB INLET SEDIMENT
STANDARD FENCEDETAILSTANDARD DETAIL REFER
AND SPECIFICATION AND
WOVEN GEOTEXTILE GRAVEL-FILLED WIRE MESH OR SUSPENDED SOLIDS WILL RESULT IN A BETTER SPECIFICATION REFER TO INTERNATIONAL EROSION
ON SOIL, 150mm x 100mm RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF. TO INTERNATIONAL EROSION CONTROL ASSOCIATION
GEOTEXTILE "SAUSAGE" ENVIRONMENTALOUTCOMEBY PROVIDINGSTORAGEFOR CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST
TRENCH WITH COMPACTED · ALL REASONABLE ANDPRACTICABLESTEPSHAVEBEENTAKENTO
THE CAPTURE AND TREATMENTOF RUN-OFF FROM THE
AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
PRACTICES STANDARD DRAWINGS SF-01 AND SF-02
BACKFILL AND ON ROCK, SET TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES; ESC-03 KERB INLET SEDIMENT TRAPS
IMMINENT RAINFALL AND RUN-OFF. SEDIMENT FENCE.
INTO SURFACE CONCRETE OVERFLOW · FLOCCULENT HAS BEEN APPROPRIATELY
· ALL REASONABLE AND PRACTICABLE APPLIED
STEPS AND HAVETHE BEEN REVEGETATION
TEMPORARY CONSTRUCTION ENTRY/EXIT
STAR PICKET TIMBER SPACER CONCENTRATION OF TSS IN THE CAPTURED WATER HAS ALREADY 13. FOR REVEGETATION STANDARD SPECIFICATION REFERANDTO
RUNOFF TAKENTO TREATTHE WATERWITHINBEST-PRACTICE TIME 11. FOR CONSTRUCTION ENTRY/ EXIT STANDARDDETAIL
FITTED WITH TO SUIT SIGNIFICANTLY
FRAMES;DECREASED. INTERNATIONAL EROSION CONTROL ASSOCIATION
SPECIFICATION REFER TO INTERNATIONAL EROSION AUSTRALASIA
WATER WITH
600mm MIN.
SECTION DETAIL SAFETY CAP 3. FOR· ALL OTHER STORMWATER
FLOCCULENT HAS BEENAPPROPRIATELYRELEASES,APPLIED
FLOWSAND ANDTHE (IECA)CONTROL
BESTPRACTICES STANDARD
ASSOCIATION DRAWINGR-01REVEGETATION
AUSTRALASIA (IECA) BEST
SEDIMENT DISCHARGES GENERAL.
CONCENTRATIONOF TSS IN THE CAPTUREDWATER IN
FROM THE SITE, THE RELEASE LIMIT PRESCRIBED HAS PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02
(1A) ABOVE MUSTNOT
ALREADY BE EXCEEDED
SIGNIFICANTLY UNLESSTHE DEVELOPMENT
DECREASED. FIELD INLETCONSTRUCTIONEXIT - ROCK PAD (CONSTRUCTIONSITES
WOVEN GEOTEXTILE IS IN3.FULL COMPLIANCE WITH
FOR ALL OTHER STORMWATER THIS STANDARD.
RELEASES, FLOWS AND 14. FOR FIELD
ONLY), INLET
EXIT-03STANDARD
- ROCKDETAIL
PADS ANDFOR SPECIFICATION
BUILDING SITES REFER
AND
SANDBAGS TO EXIT-04
INTERNATIONAL EROSION CONTROL ASSOCIATION
DISCHARGES FROM THE SITE, THE RELEASE LIMIT AND EXIT-05 CONSTRUCTION EXIT - VIBRATION GRID.
MIN. 1.5m
20m MAX. RUNOFF WATER SEDIMENT SEDIMENT CONTROL
PRESCRIBEDIN (1A) ABOVE MUST NOT BE EXCEEDED AUSTRALASIA
KERB INLET (IECA) BEST PRACTICES STANDARD DRAWING
1. ALL SEDIMENT
UNLESSAND THE EROSION CONTROL
IS IN MEASURES TO BE WITHIN ESC-02 GRATED STORMWATER (FIELD) INLET
AND SEDIMENT TRAP.
FLOW
WITH SEDIMENT DEVELOPMENT FULL COMPLIANCE 12. FOR KERB INLET STANDARD DETAIL SPECIFICATION
FLOW GRAVEL-FILLED WIRE MESH OR FILTERED WATER ACCORDANCE WITH INTERNATIONAL EROSION CONTROL OPERATION AND MAINTENANCE
THIS STANDARD. REFER TO INTERNATIONAL EROSION CONTROL
WATERWAY GEOTEXTILE "SAUSAGE" ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE 15. IN ACCORDANCE
ASSOCIATION WITH NC ESC GUIDELINES,
AUSTRALASIA (IECA) ALLBESTESCPRACTICES
MEASURES
STAR PICKETS AT MAX. SPECIFICATIONS.
SEDIMENT CONTROL SHALLSTANDARD
BE INSPECTED: DRAWING · ATESC-03
LEASTKERBDAILY (WHEN
INLET WORK TRAPS
SEDIMENT IS
2.5m SPACINGS 2. SEDIMENT
1. ALL AND EROSION
SEDIMENT CONTROL
AND EROSION DETAILS
CONTROL SHOWN ARE MINIMUM
MEASURES TO BE IN OCCURRING
REVEGETATION ON SITE) OR WEEKLY (WHEN WORK IS NOT
TYPICAL EXCAVATION REQUIREMENTS.
ACCORDANCE IT IS THE
WITHCONTRACTORS
INTERNATIONAL RESPONSIBILITY
EROSION CONTROL TO OCCURRING ON SITE)· WITHIN
13. FOR REVEGETATION 24 HOURS
STANDARD OF EXPECTED
SPECIFICATION RAIN;AND
REFER TO
MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES: INSTALLASSOCIATION
ADDITIONAL(IECA) CONTROL MEASURES
AUSTRALIA AS DEEMED
GUIDELINES AND THE · WITHIN 18 HOURS OF EROSION
INTERNATIONAL A RAINFALLCONTROL
EVENT (I.E. AN EVENT OF
ASSOCIATION
FILTERED
NECESSARY THROUGHOUT CONSTRUCTION.
SPECIFICATIONS. SUFFICIENT INTENSITY
AUSTRALASIA ANDBEST
(IECA) DURATION TO MOBILISE
PRACTICES STANDARD SEDIMENT ON
DRAWING
WATER
GEOTEXTILE EMBEDDED 1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS. 3. THE2.CONTRACTOR
SEDIMENTIS AND See the original
The page text is free to read. Viewing or downloading an original file needs an account.