Nandroya Planning Report

Attached to the e-mail MCU16/0066_Further info re: Representations regarding stormwater 6 Taylor Court Cooroy.msg.

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

leddy sergiacomi &
associates pty. itd.

LSA Ref: 45-021

 

4.3.4

[email protected]

Special Requirements for Reconfiguration
All proposed allotments comply with Table 7.1 of the scheme with a minimum area of 1,000m?

and an average width of 30 metres.

Miscellaneous Provisions

Some earthworks will be necessary onsite for the proposed development to occur, particularly in
relation to ensuring usable lots through cut and fill, roadworks and site drainage. The full extent
of earthworks will be detailed at design stage. It is unlikely that any earthworks will result in any
structure being developed below RL 98.5 as per Section 8.4.1 of the Scheme.

PLANNING SCHEME POLICIES

 

4.4.1. PSP24—- Park Requirements
Park allocation comprises the buffer areas proposed around the perimeter of the site. It is
proposed that this area of 3.37ha or 31.6% of the development site be dedicated for parkland.

4.4.2 PSP26 — Conservation of Agricultural Land
The development will not impact on any Good Quality Agricultural Land as the site has already
been converted to industrial use and has been substantially modified for this purpose. Buffer
areas will greatly assist in mitigating any potential conflict with adjoining agricultural uses.

4.4.3 PSP31 - Subdivision of Land

@ All land is to be subdivided in accordance with Section 7 of the Schedule to the Planning

Scheme.

4.5 DRAFT NOOSA PLAN

4.5.1 General
The Draft Noosa Plan is the proposed new Planning Scheme for the Shire of Noosa. It will
replace the current Schedule to the Planning Scheme, Strategic Plan, Development Control
Plans, zoning maps and regulatory maps. The new Planning Scheme has been through the public
consultation stage and is now currently awaiting the second State interest check. The release of
the new Scheme is due late 2005 or early 2006.

14 November 2005 Department of State Development, Trade and Innovation Page: 47

Planning Report
Log in to download the original file

Nandroya Planning Report.pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.