Original source · versioned page text
Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Executive Summary This report details the results of a geo-environmental investigation undertaken for a proposed one into nine lot residential subdivision at 44 Hoy Road, Lake Macdonald. The investigation comprised a site walk-over by an experienced geotechnical engineer, together with excavating test pits at twelve locations. This report summarises the results of the investigation and includes a slope stability assessment along with recommendations regarding earthworks, retaining structures, footings, drainage and pavements. Also included is a feasibility assessment for on-site wastewater treatment and disposal. A concept layout plan indicates that the proposed subdivision will comprise nine new allotments with a new central road, accessed via Hoy Road at the northern end of the site. The proposed lots are generally about 1.5 ha in area, with one larger balance lot to the east, of 7.85 ha that includes a 110 m wide environmental covenant that follows the natural drainage line. We understand that the site will remain unsewered and therefore, on-site wastewater management will be required. Subsurface conditions encountered in the test pits comprised loose, silty and clayey sand topsoil from the ground surface to depths up to 0.3 m below ground level (BGL), followed by mostly medium dense/stiff (or stronger), clayey sands or silty clays/clayey silts to depths between 0.8 m and 3.2 m BGL. The soils were generally underlain by very low to low strength siltstone/sandstone to the test pit termination depths. No signs of groundwater seepage at the surface (‘springs’) were observed during our walk-over around the proposed development areas. Groundwater seepage was encountered in five of the twelve test pits during the investigation at depths of between 0.1 m and 0.9 m BGL. Groundwater may develop or be encountered at higher levels following prolonged/heavy rainfall. Based upon the existing site conditions, together with our qualitative assessment and quantitative analysis, and subject to the implementation of recommendations given in this report, it is our assessment that there would be a Low Risk of global slope instability affecting the proposed subdivision. There is a risk that elevated soil moisture conditions could occur if the works are undertaken during a period of wet weather and shallow groundwater could become perched in the sands above the underlying less permeable clay. The upper sands could then become particularly unstable and very difficult to work, proof roll or compact under elevated moisture contents. Allowance would then need to be made for subgrade removal or improvement works during the earthworks phase. Preliminary characteristic surface movements for the natural soil profile are generally estimated to be equivalent to Class H1 in accordance with AS 2870-2011. Site classification will need to be reassessed at the Building Works stage to consider the extent of any earthworks proposed. It should be noted that filling must not exceed 1.5 m high unless assessed and approved by a geotechnical RPEQ before construction. All footings supporting the proposed residences and ancillary structures (including all retaining walls) on slopes of 10° or less must penetrate through any fill and unsuitable natural soils to found at least 0.5 m into stiff/medium dense (or stronger) residual soils, or future controlled fill. On slopes greater than 10° footings must be founded at least 0.5 m into very low strength (or stronger) sedimentary rock. The subsurface conditions encountered indicate that steel reinforced concrete bored piles or ‘bucket piers’ will generally be required unless excavations expose the required foundation materials at or near the subgrade in which case conventional high level strip or pad footings would be appropriate. Pavement design will be dependent upon the subgrade materials present after earthworks. Pavement design could be carried out adopting a design CBR value of 3% for the natural clay and silt subgrades Geo-Environmental Investigation for Proposed Subdivision 7 February 2025 | 24386-001-Rev0 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.