Original source · versioned page text
Reference Document - OPW25 0085 (AS Published)
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
and design CBR value of 5 % for the natural clayey sands. A presumptive CBR value of 10 % could be adopted for design in areas of deeper cut where very low strength (or stronger) weathered rock is exposed consistently over the full width of the road. Considering the site and soil conditions, it is recommended that on-site effluent treatment and land application for each new lot should comprise a household sewage treatment plant producing a minimum of Secondary standard effluent and connected to shallow subsurface or surface irrigation system. Based on site and soil evaluation and including conservative slope reduction and design irrigation rate, a minimum land application area of 350 m2 will be required for the new residences. There is sufficient room on the proposed lots to accommodate this. Geo-Environmental Investigation for Proposed Subdivision 7 February 2025 | 24386-001-Rev0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.