Concept earthworks drawings provided (Ref. Walsh Consulting Engineers [Walsh], Dwg No.
C6535/24/SK02, dated December 2024) indicate that mostly cut earthworks are proposed for the new
central road and driveways. Only minor filling is required on the fringes of the road alignment. No
depths/heights were given on the drawing, however considering gradients observed on site it is
anticipated that cut up to 2 m depth and filling less than 1 m height will be required for the road and
driveway construction. Text Figure 2 shows the conceptual earthworks plans for the subdivision.
Text Figure 2: Conceptual earthworks plan for the subdivision, courtesy of Walsh
Details regarding earthworks for future residential construction were unknown at the time of reporting.
We understand that the site will remain unsewered and therefore, on-site wastewater management will
be required.
Geo-Environmental Investigation for Proposed Subdivision
7 February 2025 | 24386-001-Rev0 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.