Appendix E- Traffic Impact Statement · MCU23/0078

of 145

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

 Stockwell Development Group Pty Ltd                                       SLR Ref No: 620.30926-R01-v1.0 TIA 20230524.docx
 Traffic Impact Assessment                                                                                        May 2023
 Proposed Noosa Civic Village Mixed Use Development




2.3        Road Network Planning
In order to ensure that the proposed development does not compromise the delivery of any planned
infrastructure works, Council’s Local Government Infrastructure Plan (LGIP) has been reviewed to identify any
projects within the vicinity of the site.

Council advised SLR on 29 July 2022 that the “Noosa Traffic Study to 2036 – (Holland Traffic Consulting 2016)”
informs Council’s network planning for future road and intersection upgrades. This study was prepared by
Holland Traffic Consulting (HTC) in 2016 (referred as ‘HTC 2016 study’ herein), using SIDRA to analyse critical
intersections to determine upgrade works required for the road network in Noosa Shire up to the 2036 design
scenario. The specific upgraded intersection concepts contained within the HTC 2016 study have been reviewed
by SLR to understand the planned intersection improvements for the broader road network.

In addition to intersection upgrades, the HTC 2016 study also recommended Council to facilitate diversion of
traffic on Eumundi Noosa Road to an alternative Emu Mountain Road / Walter Hay Drive route. This diversion is
encouraged so that existing and future heavy traffic demands along Eumundi Noosa Road between Beckmans
Road and Goodchap Street can be alleviated.

Table 2 summarises the details of the works identified as part of this review. Indicative locations of the works
are illustrated on Figure 3.

Table 2      Nearby Road Upgrade Projects
  Reference        Description                                                                     Timing              Costs
  R05              Noosaville, Gibson Rd / Eumundi Noosa Rd - Upgrade capacity                   2021-2026           $86,739
  R09              Noosaville, Walter Hay Dr / Eenie Creek Rd - Upgrade capacity                 2021-2026           $199,551
  R10              Noosaville, Walter Hay Dr / Eumundi Noosa Rd – Upgrade capacity               2021-2026           $28,750
  R12              Noosaville, Eumundi Noosa Rd / Eenie Creek Rd – Upgrade capacity              2021-2026           $338,952
                   Noosaville, Gympie Tce – Eumundi Rd/Gibson Rd roundabout to
  R15                                                                                            2017-2018           $696,730
                   Cloudsley St. Incl. Hilton Tce/Gympie Tce roundabout.




                                                           Page 10

Used in these records

About this file

File size
17.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E- Traffic Impact Statement.pdf · 17.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.