Skip to the record
For the highest quality transcripts.

Council archive · source document

Appendix E- Traffic Impact Statement · MCU23/0078

of 145

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

 Stockwell Development Group Pty Ltd                                           SLR Ref No: 620.30926-R01-v1.0 TIA 20230524.docx
 Traffic Impact Assessment                                                                                            May 2023
 Proposed Noosa Civic Village Mixed Use Development




Figure 2     Site Location – Local Context




2.2        Surrounding Road Network
Details of the key roads proximate to the proposed development as shown in Figure 2 are summarised in
Table 1.

Table 1      Key Surrounding Roads
  Road Name                Authority       Classification   Existing Form                                           Posted Speed
                                                            Dual carriageway with 2 lanes in each direction
                                                            plus bicycle lanes, urban cross-section (kerb
  Eenie Creek Road                             Arterial                                                                 60km/h
                                                            and channel) including pedestrian and cycle
                                                            underpass
                                                            2-4 lanes, divided, bicycle lanes, urban cross-
  Hofmann Drive                               Collector                                                                 50km/h
                                                            section
                             Council
                                                            Dual carriageway with 2 lanes in each direction
                                                            plus bicycle lanes, urban cross-section (kerb
  Walter Hay Drive                             Arterial                                                                 60km/h
                                                            and channel) including pedestrian and cycle
                                                            underpass
                                                            2-4 lanes, divided, bicycle lanes, urban cross-
  Rene Street                                 Collector                                                                 50km/h
                                                            section




                                                               Page 9

Used in these records

About this file

File size
17.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E- Traffic Impact Statement.pdf · 17.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.