Council archive · source document
Appendix B - Geotechnical Assessment · OPW23/0179
Project No. PG-10375 Page | 11 June 2023 Ref: PG-10375, 2023-06-09, LTR VER 1 Michael Cullen – Geotechnical Investigation - Proposed Residence, 128 Gympie Terrace, Noosaville The deep foundation system should be designed in accordance with the recommendations of AS 2159-2009 'Piling - Design and Installation'. The ultimate geotechnical strength (Rd,ug) of piles can be calculated using the unfactored, ultimate shaft adhesion and end bearing values given in Table 4. The Rd,ug values given in Table 4 will need to be multiplied by a suitable geotechnical strength reduction factor (øg) to obtain the design geotechnical strength (Rd,g) of piles. In accordance with AS2159-2009, the øg value must be determined by the designer, but based on the anticipated site, design and installation risk factors, a øg value of 0.48 is recommended. Higher values may be applicable with suitable supervision. If working stress methods are used in the pile design, the Rd,ug values given in Table 4 will need to be divided by a factor of safety of 2.5 to caluculate the maximum single pile working load. TABLE 4 PRELIMINARY ULTIMATE (UNFACTORED) PILE DESIGN PARAMETERS Ultimate Unfactored End Bearing* Ultimate Unfactored Shaft Material (kPa) Adhesion* (kPa) L < 4D L > 4D Loose Sand NR NR 25 Medium Dense Sand 600 900 35 Indurated Sand 1800 2700 70 Stiff Clay NR NR 25 Very Stiff Clay 600 900 35 Hard Clay 1200 1800 50 Notes: *Geotechnical strength reduction factor needs to be applied to these parameters. 1. NR – Not Recommended. 2. L – total pile length; D – pile diameter. The above design parameters should be confirmed with additional assessment, should a deep foundation system be adopted. 13.0 DEWATERING CONSIDERATIONS Construction of the basement and foundation system will likely require dewatering. The groundwater will need to be lowered to the top of the indurated sand which is expected to be virtually impermeable. Groundwater was noted at approximately 1m below ground level and excavation of up to 3m could be expected. Drawdown of approximately 2m is therefore expected to be required. Dewatering is typically achieved through the use of perimeter spears and internal wells. Where the excavation extends through the indurated sand and exposes the clays, dewatering would typically be achievable using base sump pumps to maintain dry conditions.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.