Appendix B - Geotechnical Assessment · OPW23/0179
Project No. PG-10375 Page | 5 June 2023 Ref: PG-10375, 2023-06-09, LTR VER 1 Michael Cullen – Geotechnical Investigation - Proposed Residence, 128 Gympie Terrace, Noosaville 5.0 GROUNDWATER Groundwater was noted in the boreholes at depths of 1.2m and 1.3m at the time of drilling. Water levels can be expected to vary with seasonal and climatic conditions. Typically, the groundwater levels in the area are encountered at levels of approximately RL 0.5m to RL 1.0m. Fluctuations of +/- 0.5m are typically noted in the area. Increases in the groundwater levels often occur following significant rainfall events (floods) with the groundwater levels to as much as RL 1.5m to RL 2.0m being noted in the area. 6.0 SITE CLASSIFICATION The investigation and laboratory test results indicate that from a reactivity perspective, the development site could be considered equivalent to Class ‘M’, in accordance with AS 2870-2011 'Residential Slabs and Footings', following appropriate ground improvement works under the footings. It is recommended that the readers satisfy themselves that the use of AS 2870-2011 is applicable for the proposed design and the above site classification re-confirmed following the completion of the bulk earthworks operation. 7.0 EARTHWORKS AND SITE PREPARATION CONSIDERATIONS Earthworks are expected to comprise cuts of up to 3m for the proposed basement excavation. Some over-excavation may be required to allow for ground improvement works. It is recommended that the following site preparation and earthworks procedures be carried out as part of the earthworks procedures during development. • All earthworks operations should be carried out in general accordance with AS 3798-2007 "Guidelines on Earthworks for Commercial and Residential Developments". • Trafficability across the site at the time of the investigation was assessed to be fair to good with no difficulties encountered at the time of the investigation. Following stripping and excavation for the basement, the exposed sands will be difficult to traffic for conventional vehicles. Consideration could be given to adopting a 150mm layer of pavement gravel as a working platform across the site. • All topsoil (i.e. soil containing organic matter) and soils containing deleterious matter should be stripped from the construction area at the commencement of the earthworks operation. Dirty sands (i.e. >5% fine content) could be difficult to manage and consideration could be given to the disposal of this material.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.