Appendix D - Engineering Report · REC15/0011
Attached to the e-mail REC15/0011- Development Application - 1 lot into 11 lots plus balance lot - cover letter, IDAS forms, Reports, Plans - email 1 of 2.
Proposed Subdivision
1 George Tewantin
Unitywater indicated their preference was for the whole of the site to be commanded
by a gravity sewer with the sewer mains being located on their standard alignment
within the road reserve, but acknowledged that if Council wished to retain trees
within the road reserve then they would consider alternative alignments.
We have investigated the use of bio swales and grass lined swales in lieu of bio
retention basins and found that bio swales are less effective than bio retention
basins due to the lack of detention time of water over the filter media. This results
in a greater area of swale being required compared to a bio retention basin and
thus the long term maintenance requirements for Council would effectively be
greater not less.
Our concept design therefore proposes bio retention basins to treat the stormwater
run-off from the site, however instead of on larger basin, two smaller basins have
been proposed to minimise impacts on existing trees and to make use of the natural
lay of the land. Following discussions with Council at the prelodgement meeting,
water from the lots is conveyed to the bio retention basins via a conventional piped
interlot drainage system. A gravel access is proposed down the eastern and
western side of the site to provide access for maintenance of the bio retention
basins.
In regard to run off from the existing road and footpath area of George Street,
Council has indicated a desire retain the flush kerb detail instead of replacing this
with a conventional kerb and channel. As such it is proposed to provide a grass
lined swale drain on the low side of the existing footpath. This will convey run off
from the road from the crest about mid-way along the frontage to each end of the
site.
At the western end this drain will be directed into the Council reserve and ultimately
to Wooroi Creek. At the eastern end the drain will be directed into a field inlet and
the stormwater piped to the rear of the battle axe blocks where it will be discharged
and dispersed as overland flow to the existing gully that drains to Wooroi Creek, as
is currently the case. It is proposed that future driveways servicing the new lots be
constructed with pipe culvert crossing of the swale drain in lieu of a standard urban
driveway profile. This has been depicted on the concept plans.
J/N 15513 May 2015
Rev B Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.