Minor Change Existing Approval OPW21 0202 01 (As Published) · OPW21/0202.01
14. Tree protection fencing must be installed under the supervision of the Project Arborist.
Retention of Existing Trees and Vegetation
15. No removal of additional trees within the road reserve is permitted without Council’s prior
written approval.
16. All tree and vegetation removal works must be undertaken by a qualified person*.
*(Refer to Advisory Note)
DURING CONSTRUCTION
Engineering
17. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
18. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
19. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
c. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
20. Safe access on all streets in the vicinity of the development must be maintained at all times.
Should footpath/road closures be necessary to carry out construction works, Council’s
Engineering Officer must be notified prior to the proposed closure and all requirements
complied with.
21. All works must match neatly with existing road and verge/ features. Additional works beyond
the driveways may be required to provide an acceptable transition to existing road and verge
profiles.
Driveways
22. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-056 together with any associated addendum
23. The following must be complied with during the construction of the required
crossover/driveways:
a. the driveways must be in accordance with the requirements of AS2890.1 Off-Street
Car Parking for longitudinal and crossfall gradients.
b. the driveways must be constructed so as to not concentrate or direct stormwater runoff
onto neighbouring properties or the road formation
24. Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveways will remain the responsibility of the
property owner/developer.
Stormwater Drainage
25. The constructed driveways must not cause additional ponding on the road formation or the
road reserve.
Page 4 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW21 0202 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 161 KB (small file)
- File type
No other editions are linked here.