Original source · versioned page text
2019-03-21 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 21 MARCH 2019
DA_145 Apartment Building 1 / Roof Plan prepared by November 2018
Smith + Tracey Architects
DA_146 Apartment Building 1 / Sections prepared by Smith November 2018
+ Tracey Architects
DA_147 Apartment Buildings – Photo Montage from November 2018
National Park prepared by Smith + Tracey
Architects
DA_148 ILU Type C (2B-1G) prepared by Smith + Tracey November 2018
Architects
DA_149 ILU Type C (3B-2G) prepared by Smith + Tracey November 2018
Architects
DA_150 ILU Type D (3B-2G) prepared by Smith + Tracey November 2018
Architects
DA_151 ILU Type H1 (2B-1G) + K1 (3B-2G) prepared by November 2018
Smith + Tracey Architects
DA_152 ILU Type H2 (2B-1G) + H2 (3B-2G) prepared by November 2018
Smith + Tracey Architects
DA_153 Independent Living Units – Roof Plans prepared November 2018
by Smith + Tracey Architects
DA_154 Independent Living Units – Elevation Sheet 1 November 2018
prepared by Smith + Tracey Architects
DA_155 Independent Living Units – Elevation Sheet 2 November 2018
prepared by Smith + Tracey Architects
DA_156 Independent Living Units – Typical Sections November 2018
prepared by Smith + Tracey Architects
DA_114 Masterplan / Carparking Layout prepared by Smith November 2018
+ Tracey Architects
5. The approved development comprises the following:
Multiple Housing – Type 3 Retirement & Special Needs (122 independent
living units and apartments and 96 aged care beds)
Commercial Business – Type 2 Medical (as indicated on approved plans)
7. The development may be staged in accordance with the plan titled ‘Masterplan’
prepared by Smith and Tracey dated November 2018, Plan Ref: DA_106
12. In conjunction with an application for operational works on the site for the first
stage, the applicant must submit an operational works application for Vegetation
Management for the development site. The Vegetation Management operational
works application must detail:
12.1 Identification of all active Glossy Black Cockatoo food trees within the
development footprint or in areas likely to be impacted upon by the operation
or construction of the development.
12.2 A Vegetation Clearing Offset program to be undertaken to re-establish the
habitat to be cleared from the site to a nearby location with similar soil
properties. A receiving site is to be identified and maintained for a specified
period (minimum 5 years) after the establishment of the receiving site.
12.3 The Vegetation Clearing Offset program must include the details of the
transfer methods to be engaged including:
Page 12 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.