ORDINARY MEETING MINUTES 21 MARCH 2019
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
12.3.2 Methods of transfer including, inter alia, mastication of native
vegetative matter, tile transfer of live soil/plant matrix, peat locations
and extents, sexual and vegetative methods of revegetation of offset
receiving site and other deemed pertinent matters by a person with
industry experience in the successful establishment and/or re-
establishment of heathland vegetation;
12.3.3 Transfer of rare and threatened plant species (sexual and/or
vegetative);
12.3.4 Details of pre-treatment works prior to transfer of soil/seed bank
media off the site and methods of transplanting;
12.3.5 Details of seed collections times and estimated establishment
procedures and times;
12.3.6 Details of the receiving site, including tenure, contractual details,
establishment, monitoring and maintenance details and suitability of
the site for the purpose;
12.3.7 All information must be prepared by a person with industry
experience in the successful establishment and/or re-establishment
of heathland vegetation. Industry and educational institution
involvement is recommended.
The establishment of the vegetation offsets must be completed prior to the
commencement of the use of the first stage.
14. The Vegetation Management operational works application must detail the location
and extent of vegetation disturbance on Lot 9 SP252905 and Lot 6 RP901384 must
be accurately marked on-site, including any setback requirements for bushfire
mitigation purposes, for Council officers to inspect prior to commencement of any
vegetation clearing.
18. Any lighting to the development is not to impact on the ecological values of the
adjacent National Park and the southern portion of Lot 9 SP 252905, i.e. lighting
must not be directed toward, and light spill must be minimised to, the adjacent
National Park or remnant vegetation to the south. Details of the design response
to this requirement must be submitted with the application for operational works.
27. Prior to the commencement of use of Stage 1 of the development, the applicant
must construct an eastern extension of Grasstree Court, incorporating kerb and
channel on both sides, to provide a direct connection to Ben Lexcen Drive. The
intersection must be a full intersection generally in accordance with the plan titled
Conceptual Intersection Details Ben Lexcen Drive and Grasstree Court Option 2
(Project No, 18-001942 Drawing Number 3000-SK-005) prepared by Calibre and
dated 15.01.19. The centre of the intersection of the Grasstree Court extension
with Ben Lexcen Drive must be located in line with the common property boundary
between 38 Ben Lexcen Drive and 40 Ben Lexcen Drive. The Ben Lexcen Drive
service road carriageway must be realigned as necessary to intersect at a right
angle with the Grasstree Court extension. The roadworks and intersection must be
of sufficient size to cater for large vehicles, including Council’s articulated library
vehicle, to access Grasstree Court, the frontage of the local shops and the Lipton
Street roundabout.
All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure shall be undertaken to complete the roadworks.
Page 13 of 21