Original source · versioned page text
Information Request Response
f) The development will be mostly constructed of concrete tilt panels which exhibit a high level of thermal mass
qualities and are enduring in the SEQ climate. Concrete has a relatively low whole of life cycle impact and does
not poses toxic characteristics to internal and external spaces
g) Extensive windows and openings are utilized to embrace opportunities for natural light into the internal spaces
of the building
h) No habitable rooms proposed
i) 2.7m and 3.0m internal heights achieved
j) Internal spaces are open planned and internal obstructions are avoided to allow for adaptive use of space, which
promotes efficiency
5. Information Required
Amend the species selected within the Landscape Plan – Plant Schedule to not include exotic or not endemic to the region species ensuring
they suit the hinterland location. Review the PSP2 – Landscaping preferred plant list for species.
Response
Please refer to the attached ‘Revised Landscape Plans’ which include an updated plant schedule to suit the locality
6-7. Information Required
Provide an updated Landscape Plan to include an additional three species types to the Bio-retention basin. For example, the addition of
Dianella brevipendunculata and Melaleuca thymifolia, Carex appressa, Juncus usitatis.
Provide an updated Landscape Plan to ensure the bio-retention basin plant density is a minimum 8 plants/m2.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.