Original source · versioned page text
Information Request Response
Response Please refer to the attached ‘Revised Landscape Plans’ which have revised the plant species in the Bio-retention basin and increased plant density 8. Information Required Provide an updated Landscape Plan to include extensive landscaping to provide a dense buffer designed so that 80% of the development will be screened at maturity (with adequate height vegetation) along the full frontage (10m wide buffer) of the site facing Holts Road. Response Please refer to the attached ‘Revised Landscape Plans’ which have provided an extensive planting schedule and design within the Holts Road buffer area, which in addition to the buffer width, site cut and resulting building heights and existing mature vegetation will adequately buffer the development as requested 9-10. Information Required Amend the plans to include dense landscaping buffer setbacks along all boundaries that are visible to the public i.e. Holts Road, Taylor Court and new access road. Response Please refer to the attached ‘Revised Landscape Plans’ which have increased landscape buffering within the setbacks between the building and boundaries, ensuring a mix of height and density is achieved to screen the building as requested. End of Applicants Response (please refer to the Engineers Written Response for IR Items 11-21).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.