Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published) · MCU25/0041
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
TJS-05028-01 B Site Plan & Water Allocation prepared 15 January 2025
by EDGE Consulting Engineers
TJS-05028-02 B Layout Plan prepared by EDGE 10 February 2025
Consulting Engineers
TJS-05028-03 A Elevation prepared by EDGE 3 October 2024
Consulting Engineers
TJS-05028-04 A Pontoon Decking Details prepared by 21 November 2024
EDGE Consulting Engineers
TJS-05028-05 A Pile Setout prepared by EDGE 21 November 2024
Consulting Engineers
TJS-05028-06 A Foam Details, Flat Deck Type with 21 November 2024
Deck Beams prepared by EDGE
Consulting Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with by 30 May 2027, unless an application to extend the currency period is
approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The approved use is for one (1) Landing as defined by the Noosa Plan 2020 and is to be
used for private purposes only with no commercial operations to be undertaken.
5. The existing Landing is to be decommissioned and wholly removed prior to the
commencement of the use.
6. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure must not exceed 2.
7. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
8. Gangways and walkways serving jetties and pontoons have a minimum of 1 rigid handrail
fitted with a minimum width of 750mm and maximum width of 1.5 metres.
9. The use of the landing must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
Page 2 of 14
Document Set ID: 23772192
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 915 KB (small file)
- File type
No other editions are linked here.