10. Vessels berthed/moored at the Landing must be located a minimum of 3.0 metres from the
prolongation of the property boundaries, and clear of the fish habitat area.
11. Vessels must be connected directly to the Landing and not located side by side or in tandem
with another vessel.
12. All structures must have no detrimental effects on stormwater drains and/or easements.
13. No boatlifting devices are to be attached or moored at the structure for the purpose of
elevating a vessel above the water without Council approval.
14. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
15. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
16. The pontoon and gangway are to be used for private purposes only with no commercial
operations to be undertaken.
17. Boat repair activities are not permitted on site.
18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. The mooring facility must not be utilised for live-aboard purposes.
20. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
21. Certification by a Registered Professional Engineer of Queensland that states that the
pontoon and gangway are constructed in accordance with best practice methods and are
structurally sound must be submitted to Council. This certification must be submitted to
Council within three (3) months of the completion of the works. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact Council’s
Development Assessment Branch on 5329 6500 to arrange the inspection.
22. This approval lapses where the construction of the pontoon and gangway has not
commenced within two (2) years of the date of issue of the approval, unless application is
made and approved by Council for an extension.
23. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Page 3 of 14
Document Set ID: 23772192
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 915 KB (small file)
- File type
No other editions are linked here.