Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published) · MCU25/0041
Concurrence SARA at DILGP SARA Planning Regulation The agency provided its
at DILGP Via MyDAS2 2017 response on 14 May
at https://prod2.dev- Schedule 10, Part 17, 2025 (Reference No.
assess.qld.gov.au/suite Division 1 - Tidal Works 2505-45903 SRA). A
/ (for assistance, or work in a Coastal copy of the response is
contact DILGP at 5352 Management District attached
9701 or
email:[email protected]
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Extent of Approval
1. This approval does not capture any proposed additions or alternations to the existing dwelling
or within the rear boundary setback. Any proposed additions and alternations are subject to
the Accepted Development provisions of the Noosa Plan 2020.
General Advisory Notes
2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
3. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
4. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
5. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
6. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Performance Bond Agreement
7. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Not applicable.
Page 4 of 14
Document Set ID: 23772192
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 915 KB (small file)
- File type
No other editions are linked here.